Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:10:10 UTC

A.6.M:4.5 - Worked slices

Ports line up.

Phrase:
  "The ports line up, so the modules are compatible."

ModuleRelationRepairNote:
  wholeHolonRef: VehicleControlSystem
  candidateModuleHolonRef: BrakeControllerPackage
  effectiveReferenceScheme: VehicleControlInterfaceScheme-2026Q2
  claimScope: BrakeControllerReleaseUse-2026Q2
  directModuleRelationDisposition: noDirectRelationClaimed
  boundaryRef: BrakeControlBoundary
  interfaceSpecificationGap: endpoint names are present, but protocol and semantic conditions are still missing
  admissibilityConditions: not yet declared
  claimBoundary: compatibility question; replacement, separate change, evidence and gate use are not assessed here
  unsupportedModuleInference: port labels alone do not establish implemented interface compatibility
  governedNonModuleClaimPatternRefs: A.6.5 for endpoint slots; A.6.B only if L, A, D, or E boundary-package statement classification is current; A.6.M only if a module-interface or substitution claim remains
  stopCondition: endpoint slots and missing interface-spec fields are visible

Open platform claim. A team calls its platform open. Suppose the published ExtensionGuide-v3 specifies AdapterBoundary and AdapterSpec-v3, lists the AdapterSlot, permits an adapter to be replaced after ProtocolTest-P and SchemaTest-S pass, and requires a major interface version for a semantic change. These supplied facts support a bounded claim:

Phrase:
  "This is an open platform."

OpenArchitectureClaim:
  architectureClaimRef: PlatformArchitecture-v3
  platformGrammarRef: ExtensionGuide-v3
  interfaceSpecificationRefs: AdapterSpec-v3 at AdapterBoundary
  variabilitySlotRefs: AdapterSlot
  substitutabilityPolicyRef: ExtensionGuide-v3 replacement rule requiring ProtocolTest-P and SchemaTest-S
  changePolicyRef: ExtensionGuide-v3 major-version rule for semantic change
  conformanceExpectationRefs: ProtocolTest-P; SchemaTest-S
  evidenceOrSourceRelianceRefs?: omitted until a particular adapter test or reliance claim is made
  admissibleUse: plan an adapter substitution and identify its required tests
  nonAdmissibleUse:
    the published rules do not establish that a particular replacement adapter has passed those tests

The first slice makes the missing compatibility basis usable without requiring measurement. The second uses the supplied extension and replacement rules to identify the next action: test a proposed adapter under the two named tests before claiming its conformance. Publication of the rules supports planning; a test result would support a different claim.

Supplier-diversity, procurement suitability, use-context compatibility, business constraint, policy authorization, and provider-selection claims are not module-interface fields. If those claims are being made, A.6.M names only the module-interface slice; non-module selection, procurement, work, role, evidence, assurance, gate, release, and mechanism claims are governed by the patterns named in A.6.M:12.

Team boundary claim.

Phrase:
  "The team communication boundary matches the module boundary."

ModuleRelationRepairNote:
  wholeHolonRef: PaymentsPlatform
  candidateModuleHolonRef: SettlementService
  effectiveReferenceScheme: PaymentsPlatformInterfaceScheme-2026Q2
  claimScope: SettlementServiceProductLineUse-2026Q2
  directModuleRelationDisposition: noDirectRelationClaimed; team/module correspondence remains diagnostic
  boundaryRef: SettlementServiceBoundary
  interfaceSpecificationGap: the service API exists, but semantic versioning, data schema, and semantic conditions are incomplete
  admissibilityConditions: module-interface conditions not yet established; assess team-delivery and on-call responsibility separately under their admitted predicates
  claimBoundary: assess any team, Work or procedural claim on its own basis; establish module-interface conditions separately
  unsupportedModuleInference: a communication boundary or delivery-responsibility relation alone does not establish module interface, substitutability or compatibility
  governedNonModuleClaimPatternRefs: A.2 for system-role claims; A.13 and A.15.1 for actual Work, with F.6 only for assignment-bound attribution; C.29 if the correspondence raises a separate mathematical transfer or inference question; A.6.M for the module-interface claim
  stopCondition: use the correspondence to locate an architecture question; it supplies no compatibility result

The third slice uses Conway-like mirroring as a diagnostic prompt. It does not make organization structure, communication relations, a system-role assignment, or delivery responsibility into module-interface structure by identity. Assess any team-delivery or on-call responsibility claim under its own admitted predicate for the actual Systems, scopes and intervals. Retain a supported claim, an adequately grounded negative, or an unresolved factual question as warranted. Return the A.6.RCD missing governor only when a needed defining, applicability or identity rule is absent.

If the repair proposes more modules, more open interfaces or more parallel transformation-flow paths, assess the possible costs before claiming improvement. Synchronization work, communication overhead, conformance work, shared-resource pressure, hidden exception cost, or cross-boundary change cost can become the claim being made. A.6.M repairs only the module-interface relation; speedup, bottleneck, modularity, measurement, work, and quality tradeoffs are governed by C.29, E.18, C.31, C.16, A.15, or the related subject pattern named by value when that related claim is being made.