Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:10:10 UTC

A.15:4.5 - Boundary to A.15.5 Work-Entry Readiness

Use A.15.5 when the current question is whether intended Work is ready to enter its boundary. A.15 keeps system-role kind, assignment, Method, plan, and Work distinct; A.15.5 carries WorkEntryReadiness@Context, FullKitCondition, commitment disposition, resource-readiness references, WIP or flow-policy references, planned baselines, and launch-gate references when those values are current.

Readiness is not performed Work, evidence sufficiency, or gate passage. A briefing, dashboard, source bundle, or P2W record may cue A.15.5. Ground the result in the WorkPlan being judged, the PlanItem content the criterion consumes, that criterion and the facts used to evaluate it. State the readiness result, its qualification window, and the applicable stop or degraded-use condition. Identify missing or unknown required inputs; include performed preparation Work or a planned baseline only when the criterion or receiving use consumes it. Address the PlanItem content through that WorkPlan; it is not another readiness target.