A.15:12d - P2W Performed-Work Relation
When E.18.1 reaches performed Work, keep U.Work as the admitted kind and identify one dated occurrence under it.
A performed-work record is a separate U.Episteme. It may cite a WorkPlan, planned baseline, and Work occurrence. It can state bindings, performed values, substitutions, variance, telemetry, outputs, outcome claims, and result references only through independently obtaining relations; none is stored in or constituted by the Work occurrence. Comparator, transport, PrincipleFrame, formal-substrate signature, evidence, assurance, and gate relations remain separate.