Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:50:20 UTC

A.19.ECS:9 - Rationale

An evaluation used to justify improvement must distinguish practical gains from changes to convenient proxies. Its object-kind fit, value meanings, evidence, missingness, protected trade-offs and stop conditions explain what a better reported value permits the practitioner to conclude.

A.19 governs the structure of CharacteristicSpace; A.19.ECS governs the construction method for evaluations of declared EntityOfConcern kinds and uses. A.19.ECS governs the selected characteristics, scales, coordinate construction, and evaluation-use boundaries of the evaluation characteristic space, not its publication or record form. An FPF pattern is only one possible publication form when the evaluation belongs in FPF; a local rubric, standard, table, or project rule is enough when the use is local.

E.23 stays a universal loop method because it does not need to know how every domain chooses its scales. Domain and FPF-specific evaluations such as E.21, E.9.DA, E.2.DA, and F.18 keep coordinate choices inside those evaluations.