| “This object is made of these parts.” | Identify the candidate whole and constituents and establish the part relations and construction rule. When holonhood is claimed, apply all six A.1 components and the kind-specific conditions. | A.1 for holon recognition, A.14, C.13; B.3.5 when a publication choice or named current requirement elects its assurance profile. |
| “These items belong to this collection.” | The collection’s own belongs-to rule or collection-as-whole grounding; no ComponentOf inference. | A.14, C.13, C.16 for a collection-level or whole-level characteristic. |
| “This role is combined from role factors.” | Unresolved source wording. It may mean a relation among local system-role kinds, a classification or assignment, a participation relation, a naming question, or ordinary prose; none is holonic parthood by default. | E.10.ROLE first; then A.2.7 only for the relation among local system-role kinds, or the pattern for the recovered classification, assignment, participation, or naming claim; use C.29 when a separate mathematical representation-choice, transfer or reliance question remains unresolved. |
| “This method has steps, parameters, guards, or variants.” | Method relation structure, method family, method description, or work plan; not performed work by default. | A.15, Method patterns, C.29 when a separate mathematical representation-choice, transfer or reliance question remains unresolved. |
| “This run contained episodes or concurrent sub-runs.” | Work occurrence holarchy with timing, evidence, occurrence identity, and work-part relation. | A.15.1, temporal pattern, evidence-use pattern. |
| “This graph or algebraic notation represents the structure.” | Mathematical or representation description of a selected structure. | A.22 and the applicable architecture or description pattern; C.29 when a separate mathematical representation-choice, transfer or reliance question remains unresolved. |
| “The whole shows emergence.” | Check applicable explanations within the existing whole first. Use B.2 when changed facts leave a consequential question about whether that whole remains sufficient or a new whole is required. | B.2, B.2.P, or the characteristic, measurement, architecture, capability, or Work pattern. |