Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:30:10 UTC

C.40:12 - Relations

  • C.40.CD constructs problems and obtaining ways together through examined target use; B.5.QD and C.39.RO supply question and operation construction.

  • C.39 develops a missing obtaining explanation for a local contribution; it is not a compulsory preliminary stage.

  • C.18 distinguishes archive, front, lineage and possibility-space claims about the developed material.

  • C.19 governs resource-bearing continuation of a live pool; C.11 governs a local choice.

  • C.38 constructs a finite same-result comparison from complete-enough ways.

  • C.17 characterizes generative novelty and value when those claims are needed; the applicable professional Method supplies the variation and examination.

  • E.23:4.1a and A.19.ECS:4.5 govern a justified change of evaluation; §4.5 here develops interacting challenges while preserving the comparison question.

  • Retain the sources and support needed for reliance on observations or transfer. Use A.10 when their source-to-use account remains implicit or must be replayable. Problem, capability, permission and actual Work claims retain their direct subject rules.

Opportunity and continuing development. C.40.OCN constructs a bounded opportunity before a useful contribution is settled; its inquiry, characterization, search, direction, reachability and requalification Methods can also be used independently. C.40.OD connects growth of knowledge, understanding or Methods with reproducible results and further attainable problems. C.40.JD addresses the narrower joint construction of a way, its holder and provision; C.40.NP begins from a qualified result and constructs its useful continuation. Ordinary work or acquisition of an existing Method needs no open-ended-development claim.