C.25:12 - Relations
E.21 specialises Q-Bundle-shaped claim content for FPF pattern-quality claims. C.25 remains the general endpoint pattern for engineering quality families; E.21 governs the claim when its exact EntityOfConcern is one FPF pattern version evaluated as action-guiding FPF text.
C.27 temporal-claim relation.
- C.27 may flag: a quality-family statement where agility, resilience, adaptability, recovery, or robustness depends on braking, redirection, stabilization, recovery rate, or rhythm under effort.
- This pattern keeps: quality-family bundle structure, scope, mechanism/status slots, evidence, qualification window, and failure mode.
- Non-admissible use: temporal adequacy alone does not establish quality adequacy; speed, recovery, or rhythm becomes quality content only when it contributes to a declared quality-family claim. Include scope, mechanism/status slots, evidence, and failure mode only when the claim or receiving action depends on them.
- Coordinate with C.27 only when a temporal claim is being used to change action; do not make every quality bundle carry dynamic slots.
Other relations.
- Builds on:
A.2.6for scope algebra,A.6.1for operation-declaration references when current, andC.16 / A.18for CHR legality. - Coordinates with:
C.2.2a,A.16.0,A.10for ordinary reliance on a bounded cross-context use;B.3only when a named assurance claim is current;A.15for gate use;C.16.Pfor unresolved characteristic, scale, score, metric, or proxy wording inside a quality-family statement;C.16.Qfor overloaded quality or evaluative-characterization wording;C.33,C.34, andC.35when captured structure, lost structure, preservation, or generated-result adequacy becomes part of a composite architecture quality family;C.17,C.18, andC.19for adjacent quality-family measures;F.9when bundle comparison needs semantic correspondence between local senses with different interpretation bases, orF.9.1when Bridge stance annotation is required.
- Constrains: engineering quality authoring whenever a quality term would otherwise drift between single-CHR and composite-bundle readings.
C.25:12.1 - Endpoint function in evaluative classification
Use C.25 directly when the engineering quality claim and its contributors are already recoverable. Use C.16.Q for unresolved evaluative wording and C.16.P for an unresolved Characteristic, Scale, score, metric or proxy; then return to the endpoint their result supports. qualityTermAscription(...) may remain a transitional repair record, but it is not the universal resting place when the admissible result is a claim about one Characteristic, one episteme with Q-Bundle-shaped claim content, or an explicit objective-oriented quality claim under its own endpoint pattern.