C.39.RO:7 - Conformance Checklist
- CC-RO-1 - Receiving variation. The intended changed use identifies which part of the earlier construction needs reuse.
- CC-RO-2 - Meaningful inputs. Variable inputs and retained application conditions are distinguished.
- CC-RO-3 - Obtaining operation. The proposed steps explain how the inputs produce the result, including any composed or replaced contribution.
- CC-RO-4 - Supported scope. The argument or empirical basis supports the scope claimed for the operation.
- CC-RO-5 - Changed use. A relevant changed input is worked through, including its result or useful failure.
- CC-RO-6 - Affordable completion. The receiving use can continue from the operation or its supported limit; further inquiry is selected for what it can change.
- CC-RO-7 - Local repair. A changed condition reopens its dependent operations and conclusions.