Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:15:20 UTC

E.16:9 - Mini conformance checklist (cross-E-F; author’s quick use)

  1. Declare the boundary: name the autonomy claim, consumer local kind, working situation, policy, ClaimScope, window, budget, override-authority kind, and A.2.7 incompatibility relation.
  2. Identify the proposed action: keep an unscheduled budget prospective; use action-bound for a scheduled action, its work-entry claim, real assignments/holders and independent authority. Apply the declared action identity and continuation rule.
  3. Gate permission to start: apply the appropriate prospective allocation test, budget and guards to the bounded action. Recheck permission-relevant changes. A pass is not performed Work.
  4. Record actual Work: after independent A.15.1 admission, emit the Work-anchored ledger entry, attribution and actual delta; relate it to prior permission through the policy-supported action match.
  5. Check override separately: distinguish the existing target Work from the proposed override; apply the selected actual-Work or prospective-action species to the real assignments and applicable window, and independently test authority before performance.
  6. Publish what users need: expose the budget edition, binding state, policy, override protocol, scope, and window in the UTS row.

Telemetry and selection lenses are optional.