Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:15:20 UTC

E.2:5 - Conformance Checklist

IDRequirementPurpose
CC‑P‑1An architectural pattern names the Pillars whose realization or conflict changes its design or use, with the substantive grounds required by CC‑P‑4.Makes material constitutional relations recoverable.
CC‑P‑2Every DRR proposing a normative change must include a “Pillar Impact Analysis.”Makes constitutional review explicit.
CC‑P‑3Tooling and pedagogical artefacts should document which pillar(s) shape their design.Upholds P‑2 (Didactic Primacy).
CC‑P‑4Assess the substance of every applicable Pillar constraint and any material conflict. Name the Pillars whose realization changes the pattern’s design or use; no minimum link count substitutes for that argument.Grounds conformance in the obligations that matter to the pattern.
CC‑P‑5A claim of scale or generalization advantage in computational work, or a choice invoking a local generality policy, begins with the scale-claim check in C.19.1. An empirical comparison evaluates usable performance over the declared budget range and receiving conditions. For a choice made under a project rule, identify the condition that makes the rule applicable. A bounded specialization alone calls for no audit, debt entry or waiver.Connects the choice to its empirical or policy grounds.
CC‑P‑6A pillar-impact analysis that relies on mathematical structure, scale behavior, optimization, uncertainty, invariance, obstruction, or other first-principles modeling support is complete only when that support is ordinary accepted local theory, a cited C.29 output, or a named neighboring-pattern output for evidence, causal, bridge, assurance, measurement, work, decision, publication, or admission claims.Keeps mathematical support for pillars inspectable without letting C.29 revise pillar authority.