ECO.2:4.2 - Construct feasible responses
When a response is needed, consider what changes the work permits. It may be possible to reduce use per result, substitute an input, change timing or output, increase supply or maintain the present use.
For each proposed response, establish the contributions it requires. A substitute may need another tool, skill, inspection or delivery arrangement. To use a different packaging insert, for example, establish whether it protects the product during handling. When this engineering result is missing, use SYSE.9 to obtain and apply it. Use OPS.14 to compare operating alternatives and transition costs, MA.1 for a missing resource account and FIN.6 for an investment comparison if a longer commitment is involved.
Compare the attainable net effects over the relevant period, including transition and forgone uses. Retain differences in performance and affected interests alongside the monetary comparison.