Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:50:20 UTC

ECO.7:5 - Archetypal Grounding

ECO.7:5.1 - Sharing water while retaining a downstream flow

Suppose 100 units enter a canal each day. Upstream users consume what they withdraw, and downstream users must receive at least 40 units. Two upstream groups request 50 and 40. Granting both would leave 100 − 50 − 40 = 10 downstream. The maximum combined upstream withdrawal is 60 under these conditions.

The parties know the day’s controlled inflow before withdrawal and have authority to adopt an arrangement. With 100 units, upstream allowances of 35 and 25 leave 40 downstream. A caretaker can read inlet and outlet meters, check gates and perform specified routine upkeep for €40 per week. Each upstream group can pay €20. Larger repairs need a separate decision.

The adopted agreement allows the caretaker to set allowances of 20 and 20 on an 80-unit day. Each group can meet its essential needs at 20. The caretaker announces the allowance before withdrawal and checks what happens. When two credible readings differ between 80 and 100, the parties temporarily use the lower allowance and jointly check the meter. Disagreement alone leaves the cause open.

With 80 units, withdrawals of 20 and 20 leave the required 40 downstream. Below 80 the stated essential uses cannot all be supplied. The caretaker must report that limit. If one group misses its €20 weekly payment and the other pays, the funded €40 reserve covers two weeks of the shortfall. If both groups miss their payments, it covers one week of upkeep. Once the reserve runs out, continuing service requires a replacement contribution or a feasible reduced plan. The case stipulates these means and commitments.

ECO.7:5.2 - Information and the services needed to use it

Several teams can copy a software manual without exhausting the copies. They can, however, exhaust a shared service’s processing capacity or its maintainers’ time. Identify which contribution is scarce before applying a withdrawal or access rule.