Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:25:20 UTC

F.11:11 - Worked examples

F.11:11.1 - ML service rollout

  • Method: canary deployment strategy.
  • MethodDescription: the versioned canary plan with traffic slices and rollback rules.
  • Work: two dated canary deployment occurrences.
  • Outputs: traffic-shifting commands, if material to the claim.
  • Agency: the deploying System and its A.13 core, including the exact local agential kind, classification and obtaining assignment, are part of the independent Work-admission premise. Add F.6 only for a precise attribution through that same assignment. Any responsibility claim keeps its own governor.
  • Evidence: latency and error-rate observations about the Work; the plan’s approval is separate.

The plan does not establish SLO satisfaction. F.12 evaluates the promise from Work outcomes in the stated window.

F.11:11.2 - Industrial furnace control

  • Method: PID with feed-forward.
  • MethodDescription: controller tuning sheet and program description.
  • Work: the actual PLC task cycles in the stated interval.
  • Outputs: setpoints and valve-duty values produced during those cycles.
  • Evidence: temperature observations and their scale and unit basis.

If the IEC task expression and a PROV Activity expression are related for reporting, state that exact F.9 relation and loss. It does not create the Work-to-output or evidence relations.

F.11:11.3 - Clinical assay

The Method is ELISA, its MethodDescription is kit IFU v7, and the Work is the assay