F.11:2 - Problem frame
- Design-time and run-time blur. A BPMN process description is cited as though it happened.
- Description mistaken for result. Approval of an SOP is treated as proof that later Work met a target.
- Work mistaken for output. A log of setpoints is treated as the whole Work occurrence.
- Word drift. Activity, task, execution, process, and command change meaning across sources.
- Agency blur. A Method or description is said to act, or a vague “System-in-Role” replaces the actual System, local system-role kind, assignment, Work, and performed-Work attribution.