Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:25:20 UTC

F.2:11 - Further recognition cues

The entries in this section are possible readings to inspect, not completed lexical notes. Recover each exact source basis before relying on the proposed gloss.

F.2:11.1 - Enactment and sensing

Use the completed PROV-O note as one source-backed input. The BPMN, SOSA/SSN and ITIL cues still need their exact source bases before they can be used as lexical notes. After that recovery, a writer can ask how an SOSA observation result relates to an ITIL service target; listing the expressions together does not establish sameness between BPMN process and PROV activity.

F.2:11.2 - Control and services

  • State-space control source, cited passage and scheme — actuation; Plain control output; claim: “A signal applied to influence plant state or output.”
  • IEC 61131-3, cited runtime passage and scheme — task; Plain scheduled program execution; claim as above.
  • ITIL 4 (2020), incident-management use — incident; Plain reported service disruption; claim: “An unplanned interruption or reduction in service quality.”

Use the source’s service-disruption criteria to decide whether a reported plant fault also qualifies as an ITIL incident.

F.2:11.3 - Kind, method, and knowledge sources

  • OWL 2 profile source — subClassOf; Plain class inclusion; claim: “Every instance of the first class is an instance of the second.”
  • FCA source — formal concept; Plain extent–intent pair; claim: “A maximal object–attribute pair under the stated Galois connection.”