OCE.15:4.1.2 - Decide whether to add development work
Use C.11.MV’s comparison for the same receiving result, horizon and protected conditions. A competent current implementation effort may already identify the relevant determinants, design and adapt the intervention, pretest its materials and obtain adequate use with support. Implementation Mapping is one such approach. A sufficient result from it or another qualified Method is a real finish here. Use the resulting procedure or supported continuation directly.
When a residual question matters, compare the complete continuation with and without the proposed addition. Retain common work on both sides: source and situation recovery, relevant participants, technical and organizational design, authorization, assistance, qualification and testing, integration, continuing service, observation, upkeep and failure recovery. Add development, learning and recurring burdens where they actually arise, including work displaced for participants and providers. Do not count a facilitator’s presence as free, or remove that help from the proposed line before evidence supports doing so.
Identify what the proposed work could establish for the requested conclusion, decision or its conditions. An addition may warrant more effort because it can settle, before a handover, which parts of a contribution a successor can perform with specified support. That is an accepted cost for a bounded allocation decision, not an established saving or general capability. Keep the adequate current arrangement as the fallback. If an existing qualified procedure already answers the handover question, or the observation will arrive after the allocation must be made, cancel that addition for this use. A later development opportunity needs its own worthwhile receiving question.