OPS.11:2 - Problem
A local plan can omit a necessary coupling. Product is made but goods cannot be issued without documents. Tests complete but the evidence does not apply to the release configuration. Capacity exists but access is not granted in the required window. A resource-saving change transfers cost, risk or burden to another participant.
Start with the smallest set of actual couplings that can affect the proposed action or the grounds for relying on it. An extensive network description can add work without improving either answer.