OPS.11:4.1 - Start from the proposed operating change
Name the operating result, current arrangement, proposed change and horizon. State which consequence would make the change useful or unacceptable. Reuse the current OPS.1–OPS.4 account and a matching OPS.8–OPS.10 result where available.
Select affected Systems and participants by the consequences of the change. A supplier, customer, operator or neighboring service can matter without appearing inside the local department boundary.
If one direct pattern already settles the decision and its conclusion and conditions do not depend on any further cross-structure relation, use that result and stop.