| Call every connected diagram a flow network. | Different structures and descriptions are collapsed. | Apply A.22/E.18/E.18.NET only to the object that meets the corresponding conditions. |
| Optimize material production while ignoring transaction prerequisites. | Product can accumulate without an admissible shipment. | Recover the actual goods-issue and shared-resource coupling. |
| Use evidence from the wrong configuration. | A completed test does not support the current release claim. | Bind the result to the exact subject and conditions. |
| Turn missing information into a negative world claim. | Lack of evidence is mistaken for evidence of absence. | Return the exact unresolved basis and its consequence for use. |
| Treat a coordinated diagram as permission. | The relevant decision-maker may not have authorized the action. | Establish whether a valid decision already covers the action. If permission is still needed, obtain it from the holder or report the gap. |
| Build an exhaustive enterprise map when a smaller account already settles the question. | Unneeded modeling work delays the useful result. | Select only relations that can affect the choice or the grounds for relying on it. |