Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 22:51:26 UTC · snapshot created 2026-11-18 22:54:45 UTC · last check 2026-11-19 00:00:20 UTC

OPS.5:11 - SoTA-Echoing

The question is which prepared work may start now. The serious comparator is competent policy-governed pull. The Kanban Guide 2025.5 already provides explicit workflow policies and active-work control; TameFlow’s preparation account adds useful-package readiness and distinguishes optional from committed demand. OPS adopts these contributions.

Apply both approaches to section 5.1. Using a capable pull policy, the coordinator can identify the free slot, preserve the WIP bound and admit I73-D under the authorized exception. E18 then starts the work. The possible residual is narrower: the fixture readiness required for R42-T9 differs from the safety decision required for release, and the operating coordinator cannot manufacture the latter. Sections 4.3–4.6 distinguish those consuming uses, apply the existing bound and return S19 to its owner while retaining permissible work. If the incumbent’s policies and records already do this, they are the adequate admission arrangement.

The addition costs a check of current prerequisites and permission, an exact return for a missing condition, and follow-up on deferred demand. Where eligibility rarely changes and one authority already covers the operation, a separate per-item OPS form costs more without altering starts. Reuse the existing policy and item record; do not duplicate its queue history. Where multiple authorities or prerequisites differ by action, that bounded work can prevent a ready-looking item from acquiring a permission it lacks.

FPF C.11 supplies comparison among genuine admissible alternatives; it neither sets the bound nor grants permission. Reinertsen’s historical queue and economic mechanisms inform policy questions returned to OPS.8–OPS.10. No universal WIP value, service guarantee or proof of completed Work is imported. Reopen when the unit or counting rule, readiness, authority or protected capacity changes, or when the incumbent supplies the same dispositions with less total work.