OPS.5:7 - Conformance Checklist
- The exact operating System, receiving result or commitment, configuration, and horizon are named.
- Every considered demand item has an identity and proposed receiving use.
-
Matching
OPS.2,OPS.3, andOPS.4inputs are reused when current and relevant to admission or its grounds. - Admission criteria and non-negotiable conditions include relevant evidence, authority, permissions, access, specialist returns, and currentness.
- The explicit-start limit is bounded to this use and is not presented as a universal queue, capacity, or constraint policy.
-
C.11is used only for several real live alternatives on a stable comparison basis. - Every item is admitted, deferred, rejected, or returned with reason, conditions, horizon, and any review or return required by that disposition.
- The authorized starter is named only where that relation is established.
- Residual demand remains visible.
- Admission is not claimed as started or completed Work.
- Wider Operations and specialist questions return to their direct owners.