Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 22:51:26 UTC · snapshot created 2026-11-18 22:54:45 UTC · last check 2026-11-18 23:10:20 UTC

OPS.5:7 - Conformance Checklist

  • The exact operating System, receiving result or commitment, configuration, and horizon are named.
  • Every considered demand item has an identity and proposed receiving use.
  • Matching OPS.2, OPS.3, and OPS.4 inputs are reused when current and relevant to admission or its grounds.
  • Admission criteria and non-negotiable conditions include relevant evidence, authority, permissions, access, specialist returns, and currentness.
  • The explicit-start limit is bounded to this use and is not presented as a universal queue, capacity, or constraint policy.
  • C.11 is used only for several real live alternatives on a stable comparison basis.
  • Every item is admitted, deferred, rejected, or returned with reason, conditions, horizon, and any review or return required by that disposition.
  • The authorized starter is named only where that relation is established.
  • Residual demand remains visible.
  • Admission is not claimed as started or completed Work.
  • Wider Operations and specialist questions return to their direct owners.