MMP.8:4.5 - Interpret the result and change the working method
Return the action, policy or obstruction to the original requirement. Trace a case or changed condition when its interpretation remains in doubt. A proof covering the permitted information and actions can settle the original order directly. If a planned response depends on a distinction absent from the available observation, revise the observation, defer the decision, choose a more tolerant action or change the stated goal with the responsible party.
Compare these options by what they change and cost. A more informative observation can enlarge the feasible policy set, but it may arrive too late or cost more than a sufficient fixed choice. C.11.DUA supplies that comparison. An infeasible guarantee can still leave a useful bounded, conditional or risk-qualified proposal.
For a working-method change, explain who or what supplies the observation, what result it provides, when it becomes available and what the receiving action does with it. B.1.5.CM constructs the proposed Method whole; C.32.MWA.PP connects its execution with the available performers and provision. These connections show how the participants can obtain the observation and act on it.