Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:20:20 UTC

MNT.10:11 - SoTA-Echoing

The practice question is what evidence warrants a restored-functioning claim after maintenance. This pattern adapts FPF B.3’s use-specific assurance and FPF C.16’s measurement discipline to intervention-induced failure and operating-envelope checks. Against task-sign-off or indiscriminate retesting, the Method selects checks for the functioning claims and reuses adequate evidence for unaffected claims. The PS17 comparison under load illustrates this reasoning. State the immediate use the result supports and keep any lifetime claim open until it has evidence. The applicable equipment procedures supply the acceptance criteria. Reopen when configuration, required duty, consequence or the earlier evidence’s applicability changes.