MNT.7:3 - Forces

A longer window permits more contingency but increases loss of service. Preparation before shutdown can shorten the outage while consuming scarce support. Fallback operation may preserve a contribution at reduced capacity, but only within a qualified demand and duration. The arrangement must account for uncertainty without counting the same allowance twice.