Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-21 15:19:30 UTC · snapshot created 2026-11-21 15:25:15 UTC · last check 2026-11-21 15:45:10 UTC

MA.10:4.2 - Explain the gap through changeable relationships

Construct the current or proposed activity’s economic account at sufficient detail. MA.1 relates work to resource demand and provision; MA.2 explains capacity and actual payment changes; MA.8 places development, delivery, support and withdrawal on the relevant horizon. Recover commitments already made and work already completed. They can constrain the future without becoming avoidable expenditures.

Locate the dependencies that make the proposed arrangement miss the requirement. Is the problem unnecessary work, a feature that requires expensive provision, poor yield, an indivisible supply block, low demand relative to an initial commitment, or terms that place a payment before funding is available? Distinguish a resource mechanism, a commercial term and an accounting assignment. Changing an allocation does not change the underlying burden unless the changed use of information also changes action.

Work back from the gap to dependencies that participants can change. A support cost may depend on failure modes established in product design; travel may depend on the service promise and location of provision; a capacity payment may depend on combining or separating workloads. Use those dependencies to locate the design questions. An apparently expensive activity can be necessary for the result or can prevent a larger cost elsewhere.