Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:25:20 UTC

MKT.11:4.5 - Arrange the actual continuation and failure response

Before a dependent customer action begins, confirm the necessary contributions for that case and interval. Use OPS.6 to obtain the executable continuation with a performer, effective conditions, expected result, stop or fallback, and a return to continuing operation. A sufficient existing result can be reused while its conditions hold.

Make the failure and available response identifiable to the customer or contributor who encounters it. Identify what the customer can do, who receives an unresolved case, what temporary alternative is available and what cannot honestly be promised. A customer should not have to discover which of two providers owns an internal disagreement before obtaining the agreed response.

Observe performance where a difference changes action. A provider’s delayed input, a lost permission or an exhausted support interval can invalidate a dependent continuation. Pause or revise that branch; restore its required conditions or return the supply limit to those responsible for the promise. Preserve independent useful work where its conditions remain valid. MKT.7 handles restoration or ending when the relationship decision is affected.