Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-21 14:31:57 UTC · snapshot created 2026-11-21 14:33:37 UTC · last check 2026-11-21 15:10:20 UTC

MKT.2:4.1 - Establish the receiving result and what could contribute

Recover the customer’s activity, important difficulty, existing alternative and the roles that can change the proposal. Ask what useful difference is sought, who receives it and how it could be recognised. If the purchaser wants a lower fee while users need less repeated work, retain both questions. Do not let one convenient indicator become the goal of every participant.

When the useful result is contested or not yet known, use FPF C.40.PC to separate the problem, proposed contribution and acceptance expectation. The participants may agree on a limited result while keeping their broader goals distinct. They may also decline the wider proposal.

Connect a candidate capability to that result through a concrete use: who would use what, under which conditions, to change which part of the work? A new or changed product-service arrangement may need the linked use and system concept in SYSE.2, followed by the relevant engineering and supply work. Ask its owner for the needed result and constraint; do not replace a missing function with stronger promotional wording.