Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:10:10 UTC

STR.5:12 - Relations

STR.3 and STR.4 can supply the formulation and conditions that change generation. STR.5 returns directions; STR.6 develops their option families, STR.8 examines support, and STR.9 compares consequences. STR.11 separates the selected direction and commitments from this proposed set.

C.40.NU supplies contrasting development leads when the contribution is still unsettled; C.40.PC supplies the problem/contribution inquiry and its supported, provisional or negative return. C.40.DC and C.40.JF supply development directions and reachability results when the subject and use fit. Reuse the needed result without requiring an advisory engagement or transferring the recipient’s choice to an adviser. STR.12 later distinguishes an observation affecting a proposal from a reason to revise the filter itself.

STR.17 supplies a technological possibility when the relevant change and its connection to a worthwhile contribution still need investigation. Its qualified explanation can enter direction construction; a technical improvement alone does not establish recipient value or whole feasibility.