CC-SYSE24-1 | The decision states one sought result with its kind, receiving use, configuration, horizon, and acceptance basis, and separately names the decision-making Agent. |
CC-SYSE24-2 | Every option is a whole possible-future obtaining arrangement constructed from receiving acceptance, with the supplied results, residual Work, means, and access connected. Treat labels and individual contributors only inside such an arrangement. |
CC-SYSE24-3 | A comparative choice uses materially different whole arrangements. If only one can be constructed, distinguish an established constraint from a comparison gap; do not invent a rival or claim unsupported superiority. |
CC-SYSE24-4 | The same result, acceptance conditions, operating environment, evidence horizon, and burden categories are applied to every arrangement. |
CC-SYSE24-5 | Each arrangement identifies Agents and Work separately from Methods, tools, supplied Systems, materials, data, changed subjects, assignments, and authority. |
CC-SYSE24-6 | The forward account supports consequential interface, configuration, meaning, state, time, joint-resource, assurance, capability, support, custody, change, and exit conditions, or preserves the precise gap. A repair is compared with its whole burden. |
CC-SYSE24-7 | Commercial, legal, financial, governance, organization, operations, asset, HCD, safety, security, and other specialist claims are obtained from their practices and used within those practices’ conditions and authority boundaries. |
CC-SYSE24-8 | The comparison ends in one lawful C.11 result: choose now, reject the current set, probe again, or reroute to another named question. |
CC-SYSE24-9 | A retained arrangement states the commitment supported now and any next realization Work needed. A decisive unsupported branch is resolved, probed, or used to restrict that commitment; ChoiceResult remains separate from authority, performed Work, and accepted result. |
CC-SYSE24-10 | Reopening follows changed premises through affected operations, joins, and shared conditions, reconstructs the whole alternatives on the changed basis, and preserves valid branches without automatically reopening the project focus. |
CC-SYSE24-11 | The method supports separate comparisons for different result kinds, including a System configuration and an engineering episteme. |