Accelerated Data Center Development

The engineering firm reimagined for speed. Site Due Diligence through FEED and permitting design in half the traditional time.

See How It Works

Raw plot of land to 36 MW data center concept

Marengo can deliver the feasibility study in half the time and at half the cost, without cutting corners.

50% lower time
6-8 weeks vs. 12-16 weeks traditional
50% lower cost
without cutting corners
Aerial photo of the 16 kilometres round the site, with the 500, 230 and 115 kV lines and their substations, the highways, the railway, the flood zones and rings at 1, 2 and 4 kilometres

Raw plot of land to 36 MW data center concept

Marengo can deliver the feasibility study in half the time and at half the cost, without cutting corners.

50% lower time
6-8 weeks vs. 12-16 weeks traditional
50% lower cost
without cutting corners

Step 1 of 4: Integrate infrastructure

Real engineering deliverables.

Site Due Diligence

  • Site constraints register
  • Developable-area analysis
  • Utility and infrastructure assessment
  • Site risk assessment

Feasibility & Concept

  • Test fit
  • Master plan
  • CAD layouts
  • Electrical architecture and single-line diagrams
  • Cooling concept
  • Civil and structural concepts
  • 3D coordinated model
  • Decision-ready feasibility report

FEED / Permit Design

  • Progressive multidisciplinary engineering package
  • Permit-design documentation
  • Basis of design
  • Design criteria and system architecture

See Marengo in action

Give us a site. Let Marengo show you what accelerated engineering looks like on one of your projects.