/tmp/qimob.jpg
Notice: Undefined index: ftp in /home/blacugcw/pillixy.com/wp-content/plugins/wp-photo-album-plus-xsaw-gu-2/wppa-user-order.php on line 77

Notice: Undefined variable: tmp in /home/blacugcw/pillixy.com/wp-content/plugins/wp-photo-album-plus-xsaw-gu-2/wppa-user-order.php on line 57

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/blacugcw/pillixy.com/wp-includes/functions.php on line 6114
AL Faqaa & Sweihan Desert Stables – Pillixy Contracting L.L.C.

Earth work, steel structure, block walls, drainage and potable water system, manholes, finishing and fit out work, Road work


Notice: Trying to access array offset on value of type null in /home/blacugcw/pillixy.com/wp-content/plugins/envira-gallery/src/Frontend/Shortcode.php on line 230

Notice: Trying to access array offset on value of type null in /home/blacugcw/pillixy.com/wp-content/plugins/envira-gallery/src/Frontend/Shortcode.php on line 230

Notice: Trying to access array offset on value of type null in /home/blacugcw/pillixy.com/wp-content/plugins/envira-gallery/src/Frontend/Shortcode.php on line 237
  • Client Abu Dhabi Country Club
  • Consultant Unii Engineering Consultancy
  • Duration 4 Months
  • Location ABU DHABI
  • Contract Year 2014
  • Contract value 10,000,000 DHS
  • Scope of work Steel Structure & Landscaping
×