ABL has been appointed by German transmission system operator50Hertz to provide marine warranty survey services for the 2 GW Ostwind 4 offshore grid connection project in the German Baltic Sea.
Flexible Connection Agreements (FCAs) must not be used simply to exclude BESS from connecting to the grid, but the industry will have to make do with them and all their imperfections for the foreseeable ....