GASXF) is pleased to announce the results from the drilling of the Aruchara-5 well at the MariaConchitaBlock (80% working interest) and subsequent work program at Maria Conchita for the remainder of 2026 ... Maria Conchita 2026 WorkProgram.
The drill results reported in this release are from the Candelaria zone located within the Las Conchitas South (LC-S) area ...Figure 1 - DrillHolePlan for Las Conchitas South. Figure 2 - Longitudinal Section for Las Conchitas South.
Mako Mining Intersects 26.98 g/t Au over 6.8 m Estimated True Width at Las Conchitas, Extending an Area Fully Permitted for Mining to Over 450 m of Strike...Figure 1 - DrillHolePlan for Las Conchitas South.
Caltrans suggests the detour of exiting southbound Highway 33 at the Main Street exit and turning right to Main Street and at Main Street making a right to the northbound Highway 101 on-ramp.Northbound Hwy 101 lane closure past La Conchita.