Besides the widening and desilting of Adyar estuary, the CM instructed officials to undertake the widening and desilting works in Cooum, Muttukadu and Ennore estuaries ....
Besides the widening and desilting of Adyar estuary, the CM instructed officials to undertake the widening and desilting works in Cooum, Muttukadu and Ennore estuaries ....
Once the work is over, Adyar will be able to drain about 40,000 cusecs of floodwater into sea during northeast monsoon; special team of engineers at work to ensure speedy completion of work that will minimise flood risk in southern suburbs ....
In view of heavy rain received during the northeast monsoon, discharge from the Chembarambakkam reservoir into the Adyar has been increased to 945 cusecs ....
Following a representation made by a hostel management on behalf of female students of St. Louis College for the Deaf in Adyar, MTC introduced a small bus service that operates two times a day exclusively for them ....