Latest News for: ddh

Edit

QIMC Reports Multiple Elevated Hydrogen Mud-Gas Readings Over 100m-250m Interval of DDH-26-04, Including a Peak ...

Resource World 29 Jun 2026
Importantly, Bennett Hill is located approximately 15 kilometres from the Eatonville Road drill holes DDH-26-01 and DDH-26-02, where QIMC previously reported elevated hydrogen concentrations.
Edit

QIMC Reports Elevated Clean Hydrogen in First 100 Metres of DDH-26-04 at Bennett Hill, Nova ...

Resource World 18 Jun 2026
DDH-26-04 is the inaugural drill hole at Bennett Hill, located approximately 15 kilometres from the Company’s Eatonville Road drill area (West-Advocate), where holes DDH-26-01, DDH-26-02 and DDH-26-03 were drilled.
Edit

QIMC Intersects Major Fault Breccia System in DDH-26-03 at West Advocate and Reports Elevated Hydrogen ...

Resource World 29 Apr 2026
Collectively, results from DDH-26-01, DDH-26-02, and DDH-26-03 are interpreted by the Company to be consistent with a structurally controlled natural hydrogen system within the West Advocate area.
Edit

QIMC to Begin Drilling DDH-26-03 April 21, 2026; Expands Depth to 900 Metres; DDH-26-02 Extension ...

Resource World 20 Apr 2026
Discovery HighlightsNova Scotia Hydrogen Project Drilling to begin April 21, 2026, with DDH-26-03 targeting deeper hydrogen-bearing intervals DDH-26-03 expanded to 900 metres, reflecting ...
  • 1
×