Importantly, Bennett Hill is located approximately 15 kilometres from the EatonvilleRoad drill holes DDH-26-01 and DDH-26-02, where QIMC previously reported elevated hydrogen concentrations.
DDH-26-04 is the inaugural drill hole at Bennett Hill, located approximately 15 kilometres from the Company’s EatonvilleRoad drill area (West-Advocate), where holes DDH-26-01, DDH-26-02 and DDH-26-03 were drilled.
Collectively, results from DDH-26-01, DDH-26-02, and DDH-26-03 are interpreted by the Company to be consistent with a structurally controlled natural hydrogen system within the WestAdvocate area.