“The Government of Keralam has appointed a 3-member expert committee to submit a report on the safe removal of soil accumulated from the construction of the WayanadKalladiTunnel project.
A joint site inspection and geological and geotechnical assessment of the tunnel project last month had warned about the “localised or large-scale slope failure” ....
A day after a debris slip at the tunnel road construction site in Kerala's Wayanad district claimed three lives, extensive search operations are ongoing to find five people who are still missing ....