The disruption slowed scheduled train movements across the entire 33.46-km Green Line, which connects Madavara in the northwest to SilkInstitute in the south of the city ....
Reacting to the disruption, BengaluruSouth MP Tejasvi Surya criticised BMRCL, claiming it was the 21st reported technical disruption on Namma Metro since January 2024 ....