The Phase-3 is expected to alleviate traffic congestion, and will be particularly impactful on heavily congested routes of the Outer Ring RoadWest, Magadi Road, and other major arterial roads in Bengaluru....
The line will be opened for public use after safety clearance.On demands to rename Metro stations, a senior BMRCL official said, “There are multiple requisitions for changing the names of Metro stations on this line.
BMRCL officials were included in the inspection to ensure the elevated road does not obstruct a possible future Metro alignment.</p>.Heavy rain leaves Bengaluru drenched, commuters caught in ...