Kaspersky (www.Kaspersky.co.za) in collaboration with VDC Research announced that in the first three quarters of 2025 ransomware attacks on manufacturing organisations could have generated over $18 billion in losses.
). JOHOR DATA CENTER CAMPUS OVERVIEW. A LandmarkCampus in Malaysia to Meet Unprecedented Demand. FEATURES. 73-acre (30 hectare) campus. 300MW+ of critical IT load. Three, two-story data centers once fully developed. 87,000+ M² (930,000+ SF) ... COOLING ... POWER.
(MG4AI), a developer of modular, AI-ready data center infrastructure, have announced their 800-volt direct-current (VDC) microturbine plus compute engineered equipment package to power the next generation of AI infrastructure.