What did the regulator find?. Technology qualification non-conformity. Risk management and risk understanding non-conformity. Both findings are linked to planned robotic deployments at Yggdrasil. Related reading. ... Equipment Engineering. ADIPEC 2026 ...Expro ... .
) ...Objective. The objective of the audit was to verify that Aker BP had established and applied requirements and systems for risk management, and qualified new technologies such as AI planned for use in the Yggdrasil field to ensure safe operation.
). The audit was conducted during the period 24 to 28 August 2026. Two representatives from DSB took part in the two inspections as observers. Background...Objective ... Result ... We identified one improvement point related to deficiencies in user involvement.