Client:
Consultant:
Request for Inspection (RFI)
Contract No.: To: Cc: Issued by: ITP Ref:
503406-TK5941 Mr. Manoje
Contractor:
ALSTOM
RFI No.: Date: Time: Signature: Element No:
ALSTOM/D-213 14.01.2014
Mr.SylvainLepage, Mr. Siva Aneesh Jose 503406-TK5941-Q07-002
04:00 PM
Def Close Out
Work to be Inspected:
To Close Out Deficiencies as below POV SYSTEM: 225-GTC-30, 225-GTC-29, 225-GTC-26, 225-GTC-22, 225-GTC-23 Date of inspection
Date: 15. 01. 2014 Time: 08.00 AM
Drawing No: Not Applicable Location: GTC  2 Platform Level: Consultant / Inspector Comments:
Not Applicable
Inspected by: Date:
Signature: Time:
The above works have been inspected and the next operation may proceed subject to Inspection Status. Works rejected must be resubmitted for Inspection. RETURNED TO CONTRACTOR  INSPECTION STATUS Status A: Work May Proceed B: Work May Proceed subject to incorporation of changes indicated C: Revise and Resubmit Work may not Proceed D: Inspection not required
Name: Signature: Date:
Contractors Representative
SLIIs Representative