MAIN PIPE REPLACEMENT - PHASE II - STAGE 2
SUMMARY OF PACKAGES & LIST OF CONSULTANTS
No.
Package
P3
Wilayah
Petaling
Area
Petaling
Pipe Size
(mm)
Length to be
Estimated
Estimated
Replace /
Pipe Length / Project Cost
District (km) Package (km)
(RM)
1) Taman Yarl
4.1
2) Tmn Dato Haron
0.6
3) Tmn Bkt Indah
1.6
4) Kg Melayu Subang
10.7
7) Pantai Dalam
1.5
8) TTDI Jaya
2.5
9) Tmn Goodwood
P4
Type of
Pipe
HDPE/DI
150-300
11,456,500.00
Jurutera Perunding Tegap
Sdn. Bhd.
40.7
7.5
10) Tmn United
0.4
11) Kg Desa Aman
4.0
12) SS22
1.3
13) Paramount Garden
0.9
14) SS14, Subang Jaya
0.8
15) Tmn Desa
5.0
Sub Total - Petaling
40.7
JUMLAH KESELURUHAN
20.8
Consultant
40.7
Estimated Pipe
Length/
Consultant
(km)
19.9
10,923,000.00
40.7
22,379,500.00
Jurutera Perunding Tegap
Sdn. Bhd.
40.7
PROGRAM PENGURANGAN AIR TIDAK BERHASIL
PAKEJ P4 - PROJEK PENGGANTIAN PAIP AIR LAMA (FASA II - PERINGKAT 2) DI WILAYAH PETALING
Wilayah
1
2a
2b
2c
2c
3a
3b
3c
3d
3e
3f
3g
3h
3i
Petaling 3j
4a
4b
4c
4d
4e
4f
5a
5b
6a
6b
6c
7a
7c
7d
Area
Jalan Desa Utama, Taman Desa, KL
Jalan Kangkung, Taman Goodwood, KL
Jalan Kubis, Taman Goodwood, KL
Jalan Peria, Taman Goodwood, KL
Jalan Sawi, Taman Goodwood, KL
Jalan Sepakat 8, Taman United, KL
Jalan Sepakat 9, Taman United, KL
Jalan Sepakat 1, Taman United, KL
Jalan Sepakat 2, Taman United, KL
Jalan Sepakat 3, Taman United, KL
Jalan Sepakat 4, Taman United, KL
Jalan Sepakat 5, Taman United, KL
Jalan Sepakat 6, Taman United, KL
Jalan Sepakat 7, Taman United, KL
Jalan Sepakat 10, Taman United, KL
Jalan SS 14/1, SS 14, Subang Jaya
Jalan SS 14/1A, SS 14, Subang Jaya
Jalan SS 14/1B, SS 14, Subang Jaya
Jalan SS 14/1C, SS 14, Subang Jaya
Jalan SS 14/3, SS 14, Subang Jaya
Jalan SS 14, SS 14, Subang Jaya
Jalan 20/9, Paramount Garden, Petaling Jaya
Jalan 20/4, Paramount Garden, Petaling Jaya
Jalan SS 22/27, SS 22, Petaling Jaya
Jalan SS 22/29, SS 22, Petaling Jaya
Jalan SS 22/32, SS 22, Petaling Jaya
Jalan Desa Aman 1, Kampung Desa Aman
Jalan Desa Aman 10, Kampung Desa Aman
Jalan Desa Aman 12, Kampung Desa Aman
Type of Pipe
Size (mm)
Estimated Length (km)
(SYABAS)
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
HDPE
HDPE
HDPE
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
200
150
150
150
150
150
150
150
150
5.00
TOTAL
19.90
7.50
Estimated Length (km)
(JPT)
5.00
0.60
0.13
0.13
Proposed Additional (km)
(JPT)
0.14
0.40
0.50
0.20
0.10
0.10
0.16
0.12
0.12
0.20
0.25
0.45
0.80
0.22
0.34
0.37
0.28
0.37
0.22
0.90
1.30
0.65
0.35
0.65
0.27
0.60
4.00
2.00
0.15
1.00
12.84
2.83
PROGRAM PENGURANGAN AIR TIDAK BERHASIL
PAKEJ P3 - PROJEK PENGGANTIAN PAIP AIR LAMA (FASA II - PERINGKAT 2) DI WILAYAH PETALING
Wilayah
Petaling
Area
1a
1b
1c
1d
1e
1f
1g
1h
1i
1j
1k
1l
1m
1n
1o
2a
2b
2c
2c
3
4a
4b
4c
4d
Jalan Awan Cempaka 3, Taman Yarl, KL
Jalan Awan Hijau, Taman Yarl, KL
Jalan Awan Hijau 1, Taman Yarl, KL
Jalan Awan Jawa, Taman Yarl, KL
Jalan Awan Jawa 1, Taman Yarl, KL
Persiaran Awan, Taman Yarl, KL
Jalan 7, Taman Yarl, KL
Jalan Awan Kecil, Taman Yarl, KL
Jalan Awan Kecil 1, Taman Yarl, KL
Jalan Awan Kecil 2, Taman Yarl, KL
Jalan Awan Kecil 3, Taman Yarl, KL
Jalan Awan Kecil 4, Taman Yarl, KL
Jalan Awan Kecil 5, Taman Yarl, KL
Jalan Awan Kecil 6, Taman Yarl, KL
Jalan Awan Sari, Taman Yarl, KL
Jalan Nyaman 1, Taman Bukit Indah, KL
Jalan Nyaman 10, Taman Bukit Indah, KL
Jalan Perisa, Taman Bukit Indah, KL
Jalan Lazat, Taman Bukit Indah, KL
Jalan Pantai Dalam, KL
Lorong PJS 2C/11D, Taman Dato' Haron, PJ
Lorong PJS 2C/11E, Taman Dato' Haron, PJ
Lorong PJS 2C/11H, Taman Dato' Haron, PJ
Lorong PJS 2C/11J, Taman Dato' Haron, PJ
Type of Pipe
Size (mm)
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
b/f
Estimated Length (km)
(SYABAS)
Estimated Length (km)
(JPT)
0.11
0.60
0.27
0.55
0.25
Proposed Additional (km)
(JPT)
0.35
0.55
4.10
0.35
0.21
0.25
0.30
1.60
0.35
0.35
0.24
0.30
0.50
0.35
0.40
0.60
1.50
0.60
7.80
1.70
0.10
0.10
0.10
0.12
7.59
1.41
PROGRAM PENGURANGAN AIR TIDAK BERHASIL
PAKEJ P3 - PROJEK PENGGANTIAN PAIP AIR LAMA (FASA II - PERINGKAT 2) DI WILAYAH PETALING
Wilayah
Area
Type of Pipe
Size (mm)
c/f
Petaling
5a
5b
5c
5d
5e
5f
5g
5h
5i
5j
5k
5l
5m
5n
5o
5p
6a
6b
6c
Jalan Sastera Satu U2/1A, TTDI Jaya
Jalan Sastera Satu U2/1B, TTDI Jaya
Jalan Sastera Satu U2/1C, TTDI Jaya
Jalan Sastera Satu U2/1D, TTDI Jaya
Jalan Sastera Satu U2/1E, TTDI Jaya
Jalan Sastera Satu U2/1F, TTDI Jaya
Jalan Sastera Satu U2/1G, TTDI Jaya
Jalan Sastera Satu U2/1H, TTDI Jaya
Jalan Sastera Satu U2/1J, TTDI Jaya
Jalan Sastera Satu U2/1K, TTDI Jaya
Jalan Sastera Satu U2/1L, TTDI Jaya
Jalan Opera F U2/F, TTDI Jaya
Jalan Nirwana U2/3, TTDI Jaya
Jalan Hikayat U2/9, TTDI Jaya
Jalan Prosa U2/28, TTDI Jaya
Jalan Esei U2/41, TTDI Jaya
Jalan 4D, Kg. Melayu Subang
Lorong 4D, Kg. Melayu Subang
Rumah Murah PKNS, Kg. Melayu Subang
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
D.I
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
TOTAL
Estimated Length (km)
(SYABAS)
7.80
Proposed Additional (km)
(JPT)
1.41
13.20
Estimated Length (km)
(JPT)
7.59
0.40
0.10
0.30
0.20
0.20
0.20
0.20
0.10
0.10
0.30
0.20
0.30
0.10
0.20
0.30
0.20
4.00
0.50
5.70
13.60
21.00
21.19
1.41
2.50
10.70
0.00