BRAZING PROCEDURE SPECIFICATIONS
PROCEDURE QUALIFICATION RECORDS
and
BRAZING PERFORMANCE QUALIFICATION RECORDS
As required by
NFPA 88, Standard for Health Care Facilities, 1993 Edition
According to
Section IX, ASME Boiler & Pressure Vessel Code, Welding & Brazing
Qualifications
and
ANSU/AWS B2.2 Standard for Brazing Procedure & Performance Qualification
- by
COPPER DEVELOPMENT ASSOCIATION ING,
260 Madison Avenue
New York, NY 10016
212/251-7200
March 18, 1994 A4014-00/94TABLE OF CONTENTS
Summary
ASME Brazing Documents
Grazing Procedure Specification - BPS No. CDA-003
Procedure Qualification Record - PGR No.CDA-003-HV
Brazer Performance Qualification - BPO
AWS Brazing Documents (Horizontal Joint)
Brazing Procedure Specification - BPS No CDA-001
Procedure Qualification Record - POR for BPS No. COA-001
Brazing Performance Quaiification Record - SPOR No, CDA-001-H
AWS Brazing Documents {Vertical-up Joint)
Brazing Procedure Specification - BPS Ne, CDA-002
Procedure Qualification Record - POR for BPS No, CDA-002
Brazing Performance Qualification Record - BPQR No, CDA-002-V
APPENDIX A Sample COA/ASME Forms
Brazing Procedure Specification
Procedure Qualification Record
Brazer Performance Qualificaition
APPENDIX B Sample CDNAWS Forms
Brazing Procedure Specification
Procedure Qualification Record
Brazing Performance Qualificaition Record
13
14
15
19
23
24
25
29
33
35
36
38
39
40
41
43SUMMARY
Copper Development Association Inc. (CDA) regularly receives inquiries regarding the methods
and procedures required to qualify brazers for installation of nonflammable medical gas systems.
The attached documentation has been prepared in a response to these questions and satisfies
the requirements of the National Fire Protection Association Standard for Health Care Facilities -
NFPA 98, 1893 Ecition. Chapter 4 of this standard, Gas and Vacuum Systems, Section 4-
4.1.4.2, requires brazing procedures and brazer pertormance to be qualified. These qualifications
must comply with either Section IX. Welding and Brszing Qualifications of the American Society
of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code or American Welding Society
(AWS) 52.2, Standard for Brezing Procedures and Performance Quailfication, Section 4-4.1.4.2
of NFPA 68-93 lists modifications to these standards that must also be considered
This document contains two Brazing Procedure Specification formats. One complies with ASME
and the other with AWS requirements. 174" Type L. OXV/ACR copper tube was used in both
procedures and the necessary qualification documentation and records required to qualify these
procedures are enciosed, The enclosed brazing documentation was developed by CDA and
tested by PRL Industries, Inc.," an ASME recognized test laboratory.
The instatiing contractor has the option to use either the ASME or AWS requirements to quality
brazers and should choose the appropriate documentation, To accept these specifications for
use and to meet the requirements of NFPA, the contractor shall sign and date the Brazing
Procedure Specification and its supporting qualifications prior to use.
It is the responsibility of each contractor that decides to use either of these Brazing Procedure
Specifications and the supporting qualification records to have the required tests conducted to
qualify each brazer accordingly. Itis also the contractor's responsibility to assure that these
specifications meet any additional requirements of the referencing document. Suggested forms
for nonflammabie medical gas applications in both the ASME and AWS formats are included in
the appendices for this purpose. The contractor shall maintain a signed and dated record of
the Brazing Procedure Specifications, Procedure Qualification Records and the resulting
Brazer Performance Qualifications and shall assume responsibility for representation of
any liabilities or warranties implied. CDA assumes no responsibility or liability of any kind
in connection with the use of this document and makes no representations or warranties of
any kind hereby.
‘The documentation consists of the following:
® Brazing Procedure Specifications (BPS) - the document that specifies the require
brazing variables for a specific application.
* Procedure Qualification Record (PGR) - 2 record of brazing variables and conditions used
to produce an acceptable test brazemient and the results of tests conducted on the
brazement to qualify a brazing procedure specification
© Brazing Performance Qualification Record (BPQR or BGR) - a record of the brazing
conditions used to produce an acceptable test brazement and the results of the tests
conducted on the brazement to qualify a brazer.
For information regarding CDA's brazing procedures, contact @ COA Regional Manager through
‘Copper Development Association Inc., 260 Madison Avenue. New York, NY 10016 or phone.
212/251-7200.
“PRL Industries, Inc., 64 Rexmont Road P.O. Box 142, Cornwall, PA 17016
3ASME
BRAZING DOCUMENTS
Brazing Procedure Specification
BPS No. CDA-003
Procedure Qualification Record
PQR No. CDA-003-HV
Brazer Performance Qualification
BPQCOPPER DEVELOPMENT ASSOCIATION INC.
BRAZING PROCEDURE SPECIFICATION (BPS)
See O8-200.1, Section IX, ASME Boiler & Pressure Vessel Code & NFPA 99-1993
CompanyName _ COPPER DEVELOPMENT ASSOCIATION INC.
BPS No. _CDA-003 Date _2ig/i984 Supporting POR _CDA-003-HV
Revision No. Date ‘Supporting PAR
BASE METALS:
P-No, _107 toPNo. 107,
Spec. type and grade _SB-7S __ Copper No. 12200 (See Attachment #1)
‘Chemical analysis _99.9 Cu + 0.015-0.040 P
Thickness range _ 0.054" - 0.056" TubelPipe diameter range _0.375"- §.125"0.0.
FILLER METALS
Specification No. SFA5.8 AWS Classification _BCuP.
F.No. 103 Size of shape _0.128" x 0.050" Rod
BRAZING TEMPERATURE
Temperature range (not appicetie fer toren vrazng) NIA.
BRAZING PROCESS
H.No, _101 Process _Toreh Brazing (TB)
Type _ Manual
BRAZING FLUX
AWS designation _ Flux not required
PURGE
Requirements _ Continuous flow of 99.99% pure Nitrogen
FLOW POSITION
Flow position Fiat (horizontal) and Vertica-up
Method of applying filier metal Manual feed {rom face of joint
JOINT DESIGN & TOLERANCES
Joint type _ Socket (lap) - Tuberfiting Clearance Range _0.002"- 0.010"
Lap length range _per ANSIB16.22
Minimum overlap _ 4 times the thickness of the thinner member
Sketch _ See Attachment #2 Figure #1
TECHNIQUE
Joint Preparation _ See Attachment #2 & Attachment #3Attachment #1
COPPER DEVELOPMENT ASSOCIATION INC.
BRAZING PROCEDURE SPECIFICATION (BPS)
See QB-200.1, Section IX. ASME Boiler & Pressure Vessel Code & NFPA 99-1993,
BPS No. CDA-003
TITLE
BRAZING PROCEDURE SPECIFICATION CDA.003 FOR THE BRAZING OF COPPER TUBE AND.
WROUGHT COPPER FITTINGS UTILIZING A MANUAL TORCH BRAZING PROCESS IN ACCORDANCE
WITH QB-200.1, SECTION IX, ASME BOILER & PRESSURE VESSEL CODE.
SCOPE
This procedure is applicable for the brazing of capper tube and wrought copper fitings i the range of
0.375" 0.0, to 5.125" O.D. The wall thickness range shall be 0.027" to 0.132". A test brazement shall be
Performed in the vertical-up and flat (horizontal) positions, thus qualifying the brazer in all positions.
BASE METAL (QB-402)
Base metals shall conform to the requirements of P-No. 107 and Base Metal Specification SB-75, Copper
Number C12200. ASTM B-75, seamiess copper tube, was used for testing and certification purposes,
Seamless copper tube with the same ©.D. and wall thickness listed in this BPS and that complies with
ASTM B.75. B-88, 6-280 oF B-818 may be used for brazer performance qualification However, installation
shall be limited to seamless copper tube types listed in NFPA $3
FILLER METAL (QB-403)
Filler metal shall meet the requirements of SFA 5.6 and F-Number 103, Fillet metal shall be of the AWS
BCuP series for the test brazement. Filler metal shall be stored in accordance with the manufacturers!
recommendations and shall be 0.125" x 0.050" rod.
BRAZING PROCESS (QB-405)
‘The brazing process shail meet the requirements of 4-Number 101, Manual Toren Brazing (TB)
BRAZING FLUX (QB-406)
No brazing flux shall be used in the fabrication of the test brazement
PURGE
Purge gas shall be Nitrogen, 99.99% pure. Purge gas flow rate shall be in the range of 5 to 20 SCFH and
flow continuously during the brazing process. The purge gas shall flow unti the brazernent is cool to the,
touch so that no oxidation forms on the LD, of the tube and fiting
FLOW POSITION (QB-407)
The brazements shail be configured so that flow positions are vertical-up and flat (horizontal). Filler metal
shall be appiied manually
JOINT DESIGN and TOLERANCES (08-408)
Joint type shalt be socketlap (see Attachment #2, Figure #1), The minimum and maximum joint tolerances
‘shali be 0.002" to 0.010". Lap (overlap) shall meet the requirements of ANSI 816.22 Wrought Copper and
Copper Alloy Solder Joint Pressure FitingsAttachment #2
FIGURE #1 JOINT SKETCH
Fiting
/ Tube
Capitary Space
Fitting
Flat (horizontal) Flow Vertical-up Flow
JOINT PREPARATION, ASSEMBLY & SUPPORT
CUTTING
Cut tube ends square with tube cutter. The cutter wheel shall be sharp and the cutter rollers tree rolling
to prevent tube ends from being deformed. Tube cutter shall be free of all ol, dirt, lint and other debns,
REAMING
Ream all cut tube ends to the full .D. of the tube to remove the smal! burr created by the cutting operation,
Special cate shalt be exercised to insure that no shavings ate left in the tube,
CLEANING
Removal of surlace oxidation on the |.D. of the fittng socket shall not be necessary ifthe fittings have been
cleaned according to Compressed Gas Association Famphiet G- 4.1 and kept clean until ready for use.
Surface particles and dint shall be removed from the © D of the tube ends, for a distance slightly more than
the fitung cup, using a clean lint free cloth
Surface exidation on the 0.0. of the tube shall be removed with the use of a nylon abrasive cloth for a
distance slightly more than the depth of the fiting socket, Care must be exercised fo insure that dust or
particles are not allowed to be deposited on the iD. of the tube.
When the tube ends are cleaned and the surface oxidation is removed the brazer shall perform @ visual
inspection of the tube 1.0.
ASSEMBLY AND SUPPORT
Insert tube ends into fiting cup, making sure that the tube is seated against the base of the fitting cup.
‘Support the tube and fitting assembly to insure a uniform capillary space around the entire circumference of
the joint.
POSTBRAZE CLEANING (08-410)
When the joint is coo! to the touch, the outside shall be cleaned using a wet cloth to remove loose surface
oxidation and allow a clear visual inspection of the jotAttachment #3
TABLE 1
SUGGESTED TORCH TIP SELECTION GUIDE for BRAZING.
COPPER TUBE and FITTINGS
-—
*SCFH ACETYLENE “BTU "TUBE SIZE RANGE
+
20 2340 ve" - 3/8"
36 $292 18". 12"
57 379 318" - 7/8"
83 32201 5/8" - 1-118"
4” 16170 Tie" - 1-51
445 21318 1.18". 2-178"
33.2 22804 21". 4-18"
BTUH = SCFH X 1470
(Acetylene gas has a heat content of 1470 btuh / cubic foot )
” Size ranges are given as an average. actual sizes to be brazed shall be determined by the
individual brazers abilities.
NOTE ‘The BTUH output of each type of torch shail be determined from the manufacturer's
literature for the torch usec
EXAMPLE A Victor #2 multfiame tip has an acetylene consumption at 3 (0 9 SCFH. Multiplied by
1470 BTUHicu ft would equal 4410 to 13.230 BTUH. This tip wil braze a 1/8" through
1-1/8" copper to copper joint.Sheet 1 of 2
COPPER DEVELOPMENT ASSOCIATION INC.
PROCEDURE QUALIFICATION RECORD (PQR)
‘See QB-200.2, Section IX. ASME Boiler & Pressure Vessel Code & NFPA 99-1983
Recoid of Actual Conditions Used te Braze Test Coupon
CompanyName _ COPPER DEVELOPMENT ASSOCIATION INC
POR No. _CDA-003-HV Date 222/04 Supporting BPS —_CDA.003,
BASE METALS:
P-No. _107 toP-No. 107
Spec. type and grade _SB-75 Copper No. 612200
Chemical analysis $8.9 Cu + 0.015-0.040 P
Thickness range 0.054"-0.065"___——_Tube/Pipe diameter _1.5° (1.625" 0.0)
FILLER METALS
Specification No, SFA-58 AWS Classification _BCuP.
F.No, 103 Size orshape _ 0.125" x 0.050" Rog
BRAZING TEMPERATURE
Temperature range inet apoteabe forterch prazng| N'A
BRAZING PROCESS
H.No. _101 Process _Torch Brazing (TB)
Type _Manual
BRAZING FLUX
AWS designation _Fluxnotrequited Trade name _NiA
PURGE
Requirements _ Continuous flow of 98 98% pure Nitrogen (see Note #_attached)
FLOW POSITION
Flow position _ Flat (horizontal) and Vertical-up_(see Figure #1}
Method of appiying filler metal Manual feed from face of joint
JOINT DESIGN & TOLERANCES
Joint type _ Socket (lap) - Tuberfiting Clearance Range _ 0.002" - 0.010"
Lap length range _per ANSIB16.22 _(7.99"- full socket insertion per NEPA $8-£3)
Minimum overlap 0.216" (4 times the thickness of the thinner member)
Sketch _See Figure #1 Sheet 2 of 2
TECHNIQUE
Joint Preparation See Note#2 Attachment #1 and Table #1 Attachment #2Sheet 2 of 2
FIGURE #1 JOINT SKETCH
Fitting
/ Tube
/ ~ Capitary Space
; Fitting“
Flat (horizontal) Flow Vertical-up Flow
TENSILE TESTS (Q5-150) X | Recuces Section Ful Secton
Speamen Oumensions unimate | Ubeate Fause
No Totsitsss | Stress Leeann
warm | themes oe ies (ibs) (os
tn) in ti qn)
(2) 008-Horz 15 0 362s ose 2130 30870 Tube
(2) 00¢-Hore 12 0 1626 cer? 2280 3082 Tue
£2) 008- ver. ae 0 v6z8 cee 2190 32018 Ture
(2) 003.ver! sor 060 1628 cos 2100 34683 Tube
PEEL OR SECTION TESTS (OB-170 & QB-180} Peet | x | Section
Specimen Recute
(2) 003-Horzontal | Acceptable (0%. 0% unbenzeo?
(2)003-nerzoniai | Acceptable (0%, 0% unbraxed)
(0) 003-vemeat Acceptable (0%. 0% untrazed)
12) coa.veries ‘Accepiabe (0% 9% unorazee)
Brazer’s Name: _A.G."Andy” Kireta Brazer Identification: 1-8
Brazing Witnessed by
Tests Conducted by: Bet oq thy Laboratory Test Number: 2148
We certify that the statements in this record are correct and that the test brazements were prepared,
brazed and tested in accordance with the requirements of Section IX of the ASME Code
10Attachment #1
COPPER DEVELOPMENT ASSOCIATION INC,
PROCEDURE QUALIFICATION RECORD (PQR)
‘See OB-200.2, Section IX, ASME Boiler & Pressure Vessei Code & NFPA 99-1993
BPS No. CDA-003
NOTE #1 PURGE (Requirements)
PURGE GAS
Purge gas shall conform to the following composition end purity: Nitrogen 99.68% pure. The purge gas
shall have a flow range of § 10.20 SCFH and flow continuousty during the brazing process. Purge gas shall
be permitied to flow after the completion of the brazing process. tor a sufficient time period, to insure that
no oxidation is permitted to form on the 1.0. of the tube and fitina
NOTE #2 TECHNIQUE (Joint Preparation)
CUTTING
Cut tube ends square with a tube cutter. The cutter wheel shall be sharp end the cutter rollers free rolling
to prevent tube ends from being deformed. Tube cutter shall be free of all ol, din, lint and other debris
REAMING
Ream all cut tube ends to the full LD. of the tube to remove the small burr created by the cutting operation.
Special care shall be exercised to insure that no shavings are left in the tube.
CLEANING
Removal of surface oxidation on the I,D. of the fiting socket shall not be necessary if the fittings have been
cleaned according to Compressed Gas Association Pamphlet! G- 4.1 and kept clean unbl ready for use.
Surface particles and dir shall be removed from the © of the tube ends, for 2 distance slightly more than
the fiting cup, using a clean iint free cloth
‘Surface oxdation on the O.D. of the tube shall be removed with the use of 2 nylon abrasive cioth for 3
cistance slighy more than the depth of the fing socket. Care must be exercised to insure that dust or
pariicies are not allowed to be deposited on the |. of the tube
When the tube ends are cleaned and the surface oxidation ss removed the brazer shall perform a visual
inspection of the tube LD.
ASSEMBLY AND SUPPORT
Insert tube ends into fiting cup, making sure that the tube 1s seated against the base of the fitting cup.
‘Support the tube and fitting assembly to insure @ uniform capiliary space around the entire circumference of
the joint
POSTBRAZE CLEANING
‘When the joint is cool to the touch, the outside shall be cleaned using a wet cleth to remove loose surface
oxidation and permit a clear visual inspection of the joint
WAttachment #2
VISUAL EXAMINATION
Following sectioning of the brazements, the joints shall be visually examined. The following conditions shall
be considered unacceptable according to NFPA 99-93, Section 4-4.14.3 ()
1. Flux or fux residue (not applicable to this BPS & POR}
2 Excessive oxidation of the joint
3, Presence of unmetted filer metal
4, Failure of the filer metal to be clearly visible ail the way around the exterior ofthe joint at
the intertace between the socket and the tube
5 Cracks im the tube or compenent
6 Cracksiin the braze filler metal
7. Failure of the joint to hold the required test pressure (not applicable te this BPS & POR)
TABLE 1
SUGGESTED TORCH TIP SELECTION GUIDE tor BRAZING
‘COPPER TUBE and FITTINGS
*SCFH ACETYLENE *BTUH **TUBE SIZE RANGE
20 2940 sie" - 378"
36 5292 sie" 172"
52 8379 aie" 718"
a3 12201 se" = 1-116"
1 16170 ve" 1.5/8"
148) 21315 se" = 2-178"
33.2 40804 21/8. 4-1/8"
. BTUH = SCFH X 1470
(Acetylene gas nas a heal content of 1470 biuh /cubie foot }
” Size ranges are given as an average. acival sizes to be brazed shali be determined by the
individual brazer's ables.
NOTE The BTUH output of each type of torch shall be determined from the manufacturer's
literature for the torch used.
EXAMPLE
A Victor® #2 multlame tp hes an acetylene consumption of 3 to. 9 SCFH. Multiplied by
4470 BTUHicu ft would equai 4430 to 13.230 BTUH, This tip will braze a 1/8" through
1-118" copper te copper joint
12COPPER DEVELOPMENT ASSOCIATION INC.
CONTRACTOR'S RECORD OF BRAZER PERFORMANCE
QUALIFICATION (BPQ)
BPQ# CDA-003/93
BrezersName AG. “Andy” Kireta Brazer Identification _1-A
Using BPSNo. _CDA.003, Revision
Vanables Record Actust Values Used in ‘Gustication Range
‘Qualification
‘Material Spee. (28-402) 41-172" OXWACR Copper Tube O.a75" - $125" OD.
Thickness 0.054" - 0.066" 9.027"-0.132"
‘Metal (5-403),
‘Specification No. SFASB SFASS
cass NA NA
Fumber 103 103
Brazing Temp. Range (QB-406)
{ot applicable to torch brazing) Nm NA
Brazing Process (08-405)
‘eNumber 101 101
Flow Position(e) (08-407)
‘Method of applying filer metal Flat (Horizontal) & Vertical Up All Positions
Joint Typesis) 128-408)
Joint Clearance 0.002" - 0.010" 0.002" - 0.010"
Length overlap 1.09" (per ANSI B-16.22) 2.18"
‘other NIA NA
Technique
Toreh Brazing Manual Torch Manual Torch
TEST RESULTS - Section (QB-180) - Tensile (QB-150)
Flow Position Section Tensile
(7) Flat ¢hoezontaly Setstactory Savstactory
2) Flat (nonzontay Satistactory Saustaciery
(1) veniesLue Satistactory
‘Sausfactory
(2 Vericabup Saustaciory ‘Satsacte
Tens consuceasy 2% et Sn Laboratory Test Ne 28
We certify that the Statements mad@ in this record afe correct and that the test brazements were prepared,
brazed and tested in accordance with the requirements of Section IX of the ASME Code.
Contractor COBPER)OENELOPMENT ASSOCIATION INC,
s eal bem
Date _ February 22, 1994 By
Note: Any essential variebles in addition to those above shall be recorded,
3AWS
BRAZING DOCUMENTS
(Horizontal Joint)
Brazing Procedure Specification
BPS No. CDA-001
Procedure Qualification Record
POR
Brazer Performance Qualification Record
BPQR No. CDA-001-HCOPPER DEVELOPMENT ASSOCIATION INC.
BRAZING PROCEDURE SPECIFICATION (BPS)
In Accordance with ANSVAWS 622-81 & NFPA 99-1993
BPSNo. _CDA-001 Date _ 216/94 BPOR No. _CDA.001-H
Company _ COPPER DEVELOPMENT ASSOCIATION INC.
Brazing Process _ Oxy-Fuel Torch Manuai _X _ Mechanized ‘Automate
Brazing Equipment _Oxy-Fuel Gas Toren
BRAZING CONDITIONS
BASE METAL:
Ieentification _Coppet Number €12200 Tube & Fittng BMNo. _ 300
Thickness _ 0.054" - 0.086" Preparation See Note #1 attached
Other
FILLER METAL:
FMNo, 150 AWS Classification _ AWS A5.8 BCuP
Form Rod of Wire Method of Appiication _ Manual Face Feed
FLUX:
AWS Type _ Flux not requireé Other
ATMOSPHERE:
AWS Type _NiA Other
BRAZING PROCESS:
Temperature 1275" F - 1550°F Test postion Horizontal
Time _As requited Current N/A
Fuelgas _Acetylene Tipsize _ See Table #1 attached
Postbiaze cieaning _ See Note #2 attached
Postbraze heat treatment _ N/A
Other _See Note #3 attached
JOINT:
Type _Lap (Socket) Joint - Tubertiting
Clearance 0.002" - 0.010"
uTs
omer
camKersmace
TORT eKEToH
Approved for sroducion LU basal:
Employer
18COPPER DEVELOPMENT ASSOCIATION INC.
BRAZING PROCEDURE SPECIFICATION (BPS)
In Accordance with ANSVAWS B2 2-81 & NFPA 89-1993
BPS No. CDA-001
TITLE
BRAZING PROCEDURE SPECIFICATION COA-001 FOR THE BRAZING OF COPPER TUBE AND
WROUGHT COPPER FITTINGS UTILIZING A MANUAL TORCH BRAZING PROCESS IN ACCORDANCE
WITH ANSVAWS 62.2-91 and NFPA 99-1993.
SCOPE
‘This procedure is applicable for the brazing of copper tube and wrought copper fitings in the range of
0.375" O.D. to 2.625" 0.0. The wall thickness range shall be 0.014” to 0.079". A test brazement shall be
performed in the horizontal position,
BASE METAL
Base metals shall conform to the requirements of Group 8M No. 300 as listed in Table 81 of ANSUAWS
822.91
FILLER METAL
Filler metal shall meet the requirements of Group FM No. 150 as listed in Table C1 of ANSVAWS B2.2-91
Filler metal shall be of the AWS BCuP series for the test brazement. Filler metal shall be stored in
accordance with the manufacturers’ recommendations and shall be 0,125" x 0.080" tod.
BRAZING PROCESS
‘The brazing process shalll be Manual Torch Brazing (TB). The brazement shall be configured so that flow
position is horizontal, Filler metal shall be apphed manually.
BRAZING FLUX
No brazing flux shalt be used in the fabrication of the test brezement,
PURGE
Purge gas shall be Nitrogen, 99.99% pure. Purge gas flow rate shall be in the range of 5 to 20 SCFH and
flow continuously during the brazing process, The purge gas shall flow until the brazement is cool to the
touch so that no oxidation forms on the LD. of the tube and fitting
JOINT DESIGN and TOLERANCES
Joint type shall be socketlap (see Figure #1). The mneur and maximum joint tolerances shall be 0.002"
to 0.010". Lap