Hse Program & Key Performance Indicators: Pembangunan Menara Telekomunikasi SST 45 Meter

This document outlines the health, safety, and environment (HSE) program and key performance indicators for the construction of a 45-meter telecommunications tower by PT Pertamina EP Asset 4 in Salawati, Papua, Indonesia. It shows that as of November 2018, all lagging and leading safety indicators such as injuries, damages, inspections, and meetings were on target with zero incidents reported. The HSE program requires regular equipment inspections, work permits, weekly HSE meetings, and daily toolbox meetings to ensure worker safety during the tower construction project.

Uploaded by

ibas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
534 views1 page

Hse Program & Key Performance Indicators: Pembangunan Menara Telekomunikasi SST 45 Meter

This document outlines the health, safety, and environment (HSE) program and key performance indicators for the construction of a 45-meter telecommunications tower by PT Pertamina EP Asset 4 in Salawati, Papua, Indonesia. It shows that as of November 2018, all lagging and leading safety indicators such as injuries, damages, inspections, and meetings were on target with zero incidents reported. The HSE program requires regular equipment inspections, work permits, weekly HSE meetings, and daily toolbox meetings to ensure worker safety during the tower construction project.

Uploaded by

ibas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HSE PROGRAM & KEY PERFORMANCE INDICATORS

PEMBANGUNAN MENARA TELEKOMUNIKASI SST 45 METER


Contract No :.......
Project Name : Pembangunan menara telekomunikasi SST 45 Meter. PT Pertamina Ep Asset 4. di Salawati - Papua
Company : PT. Pertamina EP Date: November 05, 2018
Year 2018 Year 2019
No Description Parameter Nov Des Jan Feb Actual Target Acumm. % Remarks
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
HANDIL YARD FABRICATION
1 Man-hours Project 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120,000 0.00% NO LTI
LAGGING INDICATOR
1 Fatality Project 0 0
2 Lost Time Injury (LTI) Project 0 0
3 Medical Treatment Injury (MTI) Project 0 0
4 First Aid Injury (FAI) Project 0 0
5 Property Damage Project 0 NO
6 Environmental Issue Project 0 NO
7 Social & Security Issue Project 0 NO
LEADING INDICATOR
HSE PROGRAM & ACTION
1 Equipment Inspection
Construction Equipment
1 Power Generator Monthly 0 4 0.00%
2 Electrical Panel Monthly 0 4 0.00%
Portable Equipment
1 Drilling Machine Monthly 0 4 0.00%
2 Grinding Machine Monthly 0 4 0.00%
3 Welding Machine Monthly 0 4 0.00%
4 Welding Rectifiers Monthly 0 4 0.00%
Lifting Equipment and Accessories
1 Crane, Chain block and lever block Monthly 0 4 0.00%
2 Lifting Gears Monthly 0 4 0.00%
Safety Equipment
1 Fire Extinguisher Monthly 0 4 0.00%
2 First Aid Kit Monthly 0 4 0.00%
3 Full Body Harness Monthly 0 4 0.00%
4 PPE Monthly 0 4 0.00%
2 Work Permit Weekly 0 20 0.00%
3 HSE Weekly Meeting Weekly 0 12 0.00%
4 HSE Toolbox Meeting Daily 0 100 0.00%

Page 1 of 1