0% found this document useful (0 votes)
163 views4 pages

Monsoon Season

This document provides guidelines for hazard identification, risk assessment, and control procedures for projects undertaken by ArcelorMittal Nippon Steel India Limited during monsoon season. It outlines a risk assessment matrix based on likelihood and consequence of hazards. Two specific hazards are identified for monsoon work - heavy rainfall/wind which could damage equipment or cause illness, and uprooted trees which could cause property damage or injury from falling material. Control measures are provided to reduce risks from a medium to low level and include inspecting equipment, avoiding outdoor work in poor weather, and not allowing people outside during storms.

Uploaded by

SARFARAJ AHMAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views4 pages

Monsoon Season

This document provides guidelines for hazard identification, risk assessment, and control procedures for projects undertaken by ArcelorMittal Nippon Steel India Limited during monsoon season. It outlines a risk assessment matrix based on likelihood and consequence of hazards. Two specific hazards are identified for monsoon work - heavy rainfall/wind which could damage equipment or cause illness, and uprooted trees which could cause property damage or injury from falling material. Control measures are provided to reduce risks from a medium to low level and include inspecting equipment, avoiding outdoor work in poor weather, and not allowing people outside during storms.

Uploaded by

SARFARAJ AHMAD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

ARCELOR MITTAL NIPPON STEEL INDIA LIMITED Ref: AMNS/Project/SS/HSEM/08

HSE MANAGEMENT SYSTEM FOR PROJECTS Revision No. 00


Effective Date: 02-11-2022
HSE PROCEDURES
(AMNSIL) HIRAC Page No. Page 1 of 4

Hazard Ranking - Likelihood of Occurrence


Probability ranking HSE Aspect
1 Never heard of in industry
2 Heard of in industry
3 Incident has occurred in our company
4 Happens several times per year in our company
5 Happens several times per year in a location

Hazard Ranking – Consequence Ranking


Consequence HSE Aspect
ranking Effect on Health Injury Asset/ Property Environment
Damage
None or First Up to 10000 INR
1 None or Negligible None or Negligible impact
Aid Injury
Minor temporary Up to 100000 INR
2 MTC/ RWC Minor temporary impact
illness
Serious reversible Up to 50,00,000 Serious but localised
3 Lost Time Injury
illness INR impact
Chronic/ irreversible Up to one crore Serious and practically
4 Fatality
illness INR irreversible impact
Multiple More than One Massive/ Catastrophic
5 Fatal
Fatalities crore Impact

Risk Assessment Matrix


INCREASING LIKELIHOOD (P)
CONSEQUENCE
1 2 3 4 5
Never heard Heard of in Incident has Happens Happens
Asset/ Property

of in industry occurred in several several


Environment
SEVERITY (S)

industry (Unlikely) our times per times per


(Rarely) company year in our year in a
Damage
People

Likely) company location


(More (Very
likely) Frequently)
Slight health Up to INR Slight Negligible Risk
1 effect /Injury 10000 effect
Minor Health Up to INR Minor Low Risk
2 Effect /injury 100000 Effect
Major health Up to INR
50,00,000 Localized Medium Risk
3 effect effect
/impact
Single Up to one Major
4 Fatality/ PD INR Crore effect
More than High Risk
Multiple One crore Massive
5 Fatality effect
INR
ARCELORMITTAL NIPPON STEEL INDIA LIMITED Ref: AMNS/Project/SS/HSEM/08/F02
HSE MANAGEMENT SYSTEM FOR PROJECTS Revision No. 00
Effective Date: 02-11-2022
HSE PROCEDURES
(AMNSIL) JOB SAFETY ANALYSIS (JSA) FORM Page No. Page 2 of 4

Appendix-4
Hazard Identification, Risk Assessment and Control (HIRAC) Record

PROJECT: MRSS-2 Project DATE OF ASSESSMENT: 17/06/2023 REV No:00

ACTIVITY: MONSOON SEASON

Risk Residual Risk


Sr. Hazard (Potential to Threat Hazard Effects Assessment (After controls) Additional controls/
Required Control Measures
No. do harm) (Scenario) (Consequence) P S RISK P S RISK Recovery Measures
L/M/H L/M/H
1. Heavy Rainfall Equipment 1. Damage to the 4 3 M  Be aware of the official cyclone warning 2 2 L  Avoid work at
and wind speed failure equipment which is  Visual inspection should be done on daily basis height and
Cyclone Material keep at the site and ensure the weather condition is good lifting work if
Water logging falling 2. People facing cold before start the job weather
cough if wet in rain  TBT shall be conduct on daily basis and aware condition is
all the people about the weather not good
 Ensure daily visual inspection and do  Do daily
maintenance periodically. visual
 Water withdrawal arrangement with stand by inspection
pump before
starting work
and keep
record.
2. Uprooting trees Falling of 1. Property and 4 3 M  Do not allow any buddy to go outside while 2 2 L  Do the daily
Slip,trip material material damage weather condition is not good visual
Person falling 2. Body injury  Do not hang any loose materials in outside inspection of
specially in monsoon season site
 Trim down trees which is near the electricity  When it
area to avoid to fall any object over the required
electrical wire working area
 Avoid standing under the tall tree and should be
electricity poles covered
 Proper and adequate access and egress temporary
arrangement must be provided with
 Every labour on the site should wear raincoat tarpaulin
ARCELORMITTAL NIPPON STEEL INDIA LIMITED Ref: AMNS/Project/SS/HSEM/08/F02
HSE MANAGEMENT SYSTEM FOR PROJECTS Revision No. 00
Effective Date: 02-11-2022
HSE PROCEDURES
(AMNSIL) JOB SAFETY ANALYSIS (JSA) FORM Page No. Page 3 of 4

and rain shoes with steel toe while working in


monsoon
3. Unauthorized Visibility is a 3 4 M  Allow only authorized person for work 1 2 N  Only allow
entry critical for a 1. People may be  Organize periodical training experienced
Poor visibility safe working effect  Proper illumination provide if required person for
environment 2. Collapse with other work
equipment  Check the
previous
work records.
4. Health hygiene Common Effect to the human 3 4 M  Inspected the
issue’s illness cause body-Dengue, cold  In case of any ill health immediately contact to area and put
the side doctor instead of self-prescription the signage
 Canteen area or temporary eatable area should for
be clean, hygiene and covered maintaining
 Make sure the drinking water should be clean the area
 Always monitoring anmo-meter for wind speed
5. Bad weather Equipment  Equipment damage 4 4 M Eliminate the work when danger atmosphere and 2 2 L 1. Safety sign
condition and overturn and  Low visibility bad weather condition boards and
uneven surface  Fall from height All drainage lines should be clear and clean posture for
 Fatal accident man-lift safety
6. Presence of Electric shock, 1. Property damage 4 4 H  All the temporary cable wire should be checked 2 2 L  Provide
power lines / fire and 2. Fire and burn for cut joint if found should be replaced training to the
energized lines environmental injury  All electrical panel board should be properly all employee
Electrocution pollution 3. Health issues covered with overhead and use rubber mat on who are
Lighting striker 4. Multiple injuries bottom area and barricade the area working there
 Loose electrical connection should be strictly about the
avoided during monsoon period location and
 Pin ,plug, socket should be checked before residual risk
installation .no wire should be without proper  You can hear
plug thunder, go
 Ensure proper earthing must be provided to indoor
the all machineries
 Lighting may cause fire. Prepare the
appropriate firefighting equipment

Prepared By (AMNS/ Contractor): BASIL ENGINEERING SERVICES


ARCELORMITTAL NIPPON STEEL INDIA LIMITED Ref: AMNS/Project/SS/HSEM/08/F02
HSE MANAGEMENT SYSTEM FOR PROJECTS Revision No. 00
Effective Date: 02-11-2022
HSE PROCEDURES
(AMNSIL) JOB SAFETY ANALYSIS (JSA) FORM Page No. Page 4 of 4

Name: SARFARAJ AHAMAD Position: Safety Officer Signature: Date:


Name: SHAJI MD Position: Site In-charge Signature: Date:
Name: JINU TRHOMAS Position: Site Supervisor Signature: Date:
Reviewed and Approved By:
Name: Position: Signature: Date:
Reviewed and Approved By AMNS HSE:
Name: Position: Signature: Date: