TÜV INDIA PRIVATE LIMITED
APPLICATION
                                                     for
                  CERTIFICATION / RE – CERTIFICATION
According to : (Tick mark as applicable)
       ISO 9001:2008                                       ISO 9001:2015
       ISO 14001:2004                                      ISO 14001:2015
       OHSAS 18001:2007                                    ISO 50001:2011
       ISO 22000                                           FSSC 22000
       HACCP                                               FAMI QS
       BRC                                                 BRC IOP
       ISO /TS 29001                                       ISO 29990
       ISO 27001                   ISO 20000-1                          ISO 22301
Integrated management system :  Yes  No (Tick mark as applicable)
                                   TÜV INDIA PRIVATE LIMITED
                                     801, Raheja Plaza – I, L.BS Marg,
                                     Ghatkopar (W), Mumbai 400 086
                                  Tel : 022-66477000 Fax : 022-6647009
                                      E-Mail: mumbai@tuv-nord.com
                                   Visit us at www.tuv-nord.com/in
QF-01                               Rev. 11/06.04.2017                        Page 1 of 12
        Questionnaire for the
        preparation of an offer
QF-01     Rev. 11/06.04.2017      Page 2 of 12
                                          Questionnaire for the
                                          preparation of an offer
This questionnaire is intended as a self-description of your company. The questionnaire
helps TÜV India Pvt Ltd to estimate the scope of and resulting effort involved in the
performance of a certification
I.     General Questions
Company:
Unit
Corporate/ Legal Entity
Address:
Phone:                                                                     Fax:
Head Office:                   _____________________________________________________________
Top Management
Name:
Phone:                                                                     Fax:
Email:
Management Representative
Name / Dept.:
Phone:                                                                     Fax:
Email:
Accreditation Desired                        DAkkS                    NABCB*      Others
* (For ISO 9001, ISO 14001, OHSAS 18001, ISO 22000, ISO 50000 only)
Consultancy By
Scope of Management System: (Text on certificate, description of activities regarding products or
services, e.g.: “design, production and sales of…”)
                                    ______________________________________________________
                                    ______________________________________________________
                                    ______________________________________________________
Please attach Organization Chart
Please attach simple process flow chart.
QF-01                                        Rev. 11/06.04.2017                      Page 3 of 12
                                    Questionnaire for the
                                    preparation of an offer
II.   Basic Questions
A. Raw Materials :               ______________________________________________________
                  ______________________________________________________
Is Raw Material supplied by your customer?                               yes            no
B. Does the company have Product design responsibility?                  yes            no
If no : ( Who is responsible):
 C Number of employees                                          HO/ Central
                                                                 functions Location 1    Location 2
                                                                  location
  Break Up of Employee management
  count:                research/development/design
                        employees in all the other
                        departments ( Manufacturing,
                        stores, sales, purchase, QC,
                        dispatch, Training etc.)
                        Regular Employees Total (A)
                        Contract employees
                      - Part time / Seasonal
                        employees
                        Temporary unskilled /
                        Subcontractor’s employee
                           Others                   Total (B)
                           Grand Total                 (A+B)
For additional site information, submit an annex
 D. No. of sites / subsidiaries:        ___________________________________________
 Addresses of sites / subsidiaries/                 No. of employees
 warehouse/ Regional Offices / Branch               Regular Others*       Comments
               Offices /Sales offices**
* other employees (subcontractors, seasonal workers, part-timers, etc.)
QF-01                                 Rev. 11/06.04.2017                        Page 4 of 12
                                    Questionnaire for the
                                    preparation of an offer
**do these Offices carry out any activities which are to be audited (Contract Review, Purchasing,
Servicing, Training, Storage/ Godowns).
E. Operation of temporary sites (e. g.: building sites, projects):  Yes        No
No. of temporary locations:__________ ( Please attach the list with location, activity, employees)
Outsourced Processes ( if any) ___________________________________________________
F.     Has the company and/or have the sites been certified against any Management
       System Certification? If yes, then specify e.g. ISO 9001, ISO 14001, OHSAS (by which
       Certification Body, and Validity of the Certificate ( Please attach copy of the certificate)
Is the environmental management system / OHSAS integrated into an existing certified
management system? (e. g.: ISO 9001, TS 16949)?
                  Yes          No
G. Information on Shift is Mandatory
                                                   Site I         Site II             Head Office
     No. of Employees not in Shift
     No. of Employees in First Shift
     No. of Employees in Second Shift
     No. of Employees in Third Shift
We herewith confirm the completeness and accuracy of the information given above and in any
annexes which may be attached. We agree that this information may be stored for the purposes of
drafting an offer and processing any resulting order or transactions.
H. Names of clients in Petroleum oil & Natural Gas Sector(Required for ISO/ TS 29001)
_____________________________________________________________________________
______________________________________________________________________________
Place/Date                              Name, Function                      Signature*)
*) Mandatory only if it is hard copy.
QF-01                                   Rev. 11/06.04.2017                        Page 5 of 12
                                   Questionnaire for the
                                   preparation of an offer
                                             Annex I ( EMS)
Area of the location (m2 or hectare):_____________________________________
Significant environmental impacts of the activities, products and services of the organisation
(e. g.: waste, hazardous waste, waste water, emissions [air pollution, noise], soil contamination):
Operation of environmentally relevant facilities (e. g.: sewage treatment plant, landfill,
waste treatment plant, electroplating):
Is the organisation located in a water protection area or in a landscape conservation area?
                Yes            No
Operation of temporary sites (e. g.: building sites, projects):
                Yes           No
No. of temporary locations:__________
Place/Date                              Name, Function                  Signature*)
*) Mandatory only if it is hard copy.
QF-01                                   Rev. 11/06.04.2017                      Page 6 of 12
                                     Questionnaire for the
                                     preparation of an offer
                                        Annex II (Food Safety)
Product Category (names)
Number of processes included in HACCP
studies
Number of production lines for the relevant
products or product families.
Seasonal Products
Months of Production
Out sourced Processes (give details)
Area of Production facility ( sq. meters)
Tick where applicable                                                YES               NO
Is there a HACCP team?
Does the team avail of the required knowledge?
No of HACCP Studies
Have HACCP studies been performed for
       Raw materials (incl. packaging)
       Intermediate products
       End products
Does HACCP STUDY compromise the following steps?
 1. analysis of risk potential for the area under observation
  2. Specification of manageable number of CCP’S
  3. List of critical limits for each CCP
  4. System for monitoring CCP’s
  5. Documentation of monitoring procedure
  6. Are PRP’s and OPRP’s identified?
PLANT ENVIRONMENT
Are the immediate surrounding environments congenial for plant
operations (with respect to safety from contamination?)
 Place/Date                           Name, Function             Signature*)
*) Mandatory only if it is hard copy.
QF-01                                   Rev. 11/06.04.2017              Page 7 of 12
                                  Questionnaire for the
                                  preparation of an offer
                           Annex III (Information Security Standards)
Description of the organization groups / Locations referring to the certification of the ISMS:
Number of locations: ___________________
 Location              Full postal address                     Total
                                                                         Application development
     in                                                    Manpower
certificatio                                              (contractua      & maintenance staff
 n scope                                                    l/payroll)
  (LOC)
Details about IT-installation in the organisation:
LOC      Workstations/     Servers     Legal requirements           Sector specific       Network &
         Laptops/PC                                                 risk                  encryption
                                                                                          technology
Details on the IT-security relevance of the company
Please state the important IT-security aspects at each location
Please list out the applicable legal, statutory and regulatory requirements for your organization.
        ure
 We herewith confirm the completeness and accuracy of the information given above
 Place/Date                           Name, Function                     Signature*)
*) Mandatory only if it is hard copy.
QF-01                                Rev. 11/06.04.2017                         Page 8 of 12
                                 Questionnaire for the
                                 preparation of an offer
                               Annex IV (Health & Safety Standard)
1. OHS-relevant plant and machinery / manufacturing processes / activities at the
    location
(What OHS-relevant plant and machinery / manufacturing processes / activities are there
at the location?)
2. Construction sites / Workshops / Subcontractor activities at the location
(What internal / external / workshops are operated by the location, what subcontractors work at
the location?)
QF-01                               Rev. 11/06.04.2017                      Page 9 of 12
                                    Questionnaire for the
                                    preparation of an offer
3. Hazards at the location
        What major hazards - mechanical hazards, electrical hazards, hazardous substances (e.g.
        gases, vapours, aerosols, liquids), fire and explosion hazard, thermal hazard, biological
        hazard (e.g. infection by means of microorganisms, virus or biological manufacturing
        substances. Hazards from special physical effects (e.g. noise, radiation, electromagnetic
        fields) hazard from working conditions (e.g. climate, lighting), physical strain (e.g. through
        movement or remaining in the same position), and other risk factors - are present at the
        location, taking internal / external construction sites and work shops particularly into
        consideration.
We herewith confirm the completeness and accuracy of the information given above
Place/Date                              Name, Function                   Signature*)
*) Mandatory only if it is hard copy.
QF-01                                   Rev. 11/06.04.2017                      Page 10 of 12
                                       Questionnaire for the
                                       preparation of an offer
          Annex V (EnMS) (ENERGY MANAGEMENT SYSTEM) (as per ISO 50001:2011)
Information required for preparation of offer:
Type of ENERGY used: (kindly indicate appropriate)
Sr.       Type of ENERGY used                                             Consumption /        Consumption /
No.                                                                       Annum (MWH /         Annum (TJ /
                                                                          annum)               annum)
01        Total Electrical Energy consumed in one year
          (including equipment / machinery operation, lighting,
          compressed air, electrical heating, etc.)
Conversion Factor :
1 MWH = 0.0036 TJ (Tera Joules)
Sr.       Type of ENERGY used                                             Consumption /          Consumption /
No.                                                                       Annum (Tonnes /        Annum (TJ /
                                                                          annum)                 annum)
02        Total Amount of Fuel used for any purpose (including
          Coal, Diesel, Furnace Oil, Light Diesel Oil, Petrol,
          LPG, CNG, PNG)
Conversion Factor :
1 Tonne = 1.162 MWH = 0.0041 TJ (Tera Joules)
Sr. No.      Number of energy sources                              Type of energy sources
Sr. No.      Number of significant energy usage                    Type of significant energy usage
             (SEUs)                                                 (SEUs)
Details of Employees
Sr. No.   Type of Employee                                                           Number of Employees
01        Top Management
02        Management Representative (for EnMS)
03        Energy Management Team (or EnMS Co-ordinators)
04        *Employees whose work will have impact on EnMS
* Employees such as Furnace Operators, Supervisors, Engineers except helpers, etc.
Are you part of the Perform-Achieve-Trade (PAT) energy efficiency cap-and-trade scheme of the
Bureau of Energy Efficiency (BEE) of India? Yes / No
Is your organization certified to EMS (Environmental Management System) as per ISO 14001
standard? Yes/ No.
QF-01                                     Rev. 11/06.04.2017                            Page 11 of 12
                                Questionnaire for the
                                preparation of an offer
Please attach:
   1. Process flow diagram
   2. Utility flow diagram
   3. Copy of valid EMS Certificate
 We herewith confirm the completeness and accuracy of the information given above .
Place/Date                        Name, Function                   Signature
QF-01                              Rev. 11/06.04.2017                     Page 12 of 12