N-Trip Sheet RIH

The document discusses preparing a trip sheet for running drill pipe and drill collars back into a wellbore. It provides an example trip sheet for running in hole with 12 1/4" drill bit along with 80 stands of 5" drill pipe and 6 stands each of 8 1/4" and 6 1/2" drill collars. The trip sheet tracks the stands tripped, theoretical and actual displacement, and gain or loss of fluid during the operation. Proper preparation of a trip sheet is important for safely conducting tripping operations.

Uploaded by

Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views5 pages

N-Trip Sheet RIH

The document discusses preparing a trip sheet for running drill pipe and drill collars back into a wellbore. It provides an example trip sheet for running in hole with 12 1/4" drill bit along with 80 stands of 5" drill pipe and 6 stands each of 8 1/4" and 6 1/2" drill collars. The trip sheet tracks the stands tripped, theoretical and actual displacement, and gain or loss of fluid during the operation. Proper preparation of a trip sheet is important for safely conducting tripping operations.

Uploaded by

Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Trip sheet (RIH)

Presented by “Petroleum Capsules” Channel

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
Tripping

POOH RIH

Wet Dry Close end Open end

Prior to start tripping Operations we’ve to prepare the trip sheet by the following:-

1-Determine the classification of tripping (POOH/RIH).

2-Determine the type of tripping (Wet=close end/Dry=open end).

3-Determine the type of string involved in this operation.

4-Prepare the calculations of metal displacement for the string components.

5-Make your own table to facilitate the calculations.

6-Print the Trip Sheet and start to fill the data.

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
For Example

If you RIH (open end=without float valve) with Drill string consist of the following:-

12 ¼’’ Bit.

6 std. x 8 ¼’’ Drill Collar ID=2.875 in.

6 std. x 6 ½’’ Drill Collar ID=2.8125 in.

80 std. x 5’’ Drill Pipe ID=4.27 in.

Metal Displacement
Type O.D I.D
Close End (Wet) Open End (Dry)
=(O.D)^2/1029.4 =(O.D^2-I.D^2)/1029.4
6xDC 8 ¼’’ 2.875
0.066119 0.058089
6xDC 6 ½’’ 2.8125 0.041043 0.033359
80xDP 5’’ 4.27 0.024286 0.006574

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
Trip Sheet
Date Time Rig No.
Trip Type Run In Hole (RIH)

Drill pipe size, in DC size, in


Drill pipe Displacement, bbl./ft. DC Displacement, bbl./ft.
Drill pipe stand/single length ,ft. DC stand/single length, ft.
Drill pipe stand/single displacement, bbl. DC stand/single displacement, bbl.

No of Displacement Cumulative Trip Trip Tank Cumulative Difference between


Std. Cum.
Stands Per Stand/Single Theoretical Tank Level Trip Tank actual displace and
no Differ. + Gain
Tripped Tripped Displacement Level Change Level Change theoretical displace
- Loss
E
A B=A-Ax C=B*Met.Disp D=Dx+C F=E-Ex G=Gx+F H=D-G I=Ix+H

No. Name Position Signature


1 Ass. Driller
2 Driller
1 S.T.P

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
Trip Sheet
Date Time Rig No.
Trip Type Run In Hole (RIH)

Drill pipe size, in 5 DC size, in 8 ¼ ‘’


Drill pipe Displacement, bbl./ft. 0.00657 DC Displacement, bbl./ft. 0.058089
Drill pipe stand length ,ft. 94.5 DC stand length, ft. 94.5
Drill pipe stand displacement, bbl. 0.620865 DC stand/single displacement, bbl. 5.460366
HWDP size, in N/A DC size, in 6 ½’’
HWDP Displacement, bbl./ft. N/A DC Displacement, bbl./ft. 0.033014
HWDP stand/single length ,ft. N/A DC stand/single length, ft. 94.5
HWDP stand/single displacement, bbl. N/A DC stand/single displacement, bbl. 3.119823

No of Displacement Cumulative Trip Trip Tank Cumulative Difference between


Std. Cum. +
Stands Per Stand Theoretical Tank Level Trip Tank actual displace and
no Differ. Gain
Tripped Tripped Displacement Level Change Level Change theoretical displace
-
E
A B=A-Ax C=B*Met.Disp D=Dx+C F=E-Ex G=Gx+F H=G-D I=Ix+H Loss
0
1 1 5.460366 5.460366 3.5 3.5 3.5 -1.960366 -1.96036 Loss
2 1 5.460366 10.920732 10 6.5 10 -0.920732 -2.88109 Loss
3 1 5.460366 16.381098 18 8 18 1.618902 -1.26219 Gain
4 1 5.460366 21.841464 22 4 22 0.158536 -1.10366 Gain
5 1 5.460366 27.30183 27 5 27 -0.30183 -1.40549 Loss
6 1 5.460366 32.762196 32 5 32 -0.762196 -2.16768 Loss
12 6 18.8142 51.576396 53 21 53 1.423604 -0.74408 Gain
20 8 4.9664 56.542796 57 4 57 0.457204 -0.28687 Loss
25 5 3.104 59.646796 62 5 62 2.353204 2.066326 Gain
30 5 3.104 62.750796 63 1 63 0.249204 2.31553 Gain
35 5 3.104 65.854796 64 1 64 -1.854796 0.460734 Gain
40 5 3.104 68.958796 67 3 67 -1.958796 -1.49806 Loss
45 5 3.104 72.062796 74 7 74 1.937204 0.439142 Gain
50 5 3.104 75.166796 76 2 76 0.833204 1.272346 Gain
55 5 3.104 78.270796 80 4 80 1.729204 3.00155 Gain
60 5 3.104 81.374796 82 2 82 0.625204 3.626754 Gain
65 5 3.104 84.478796 83 1 83 -1.478796 2.147958 Gain
70 5 3.104 87.582796 86 3 86 -1.582796 0.565162 Gain
75 5 3.104 90.686796 87 1 87 -3.686796 -3.12163 Loss
80 5 3.104 93.790796 90 3 90 -3.790796 -6.91243 Loss

No. Name Position Signature


1 Ass. Driller
2 Driller
1 S.T.P

E.Abdullah Mahmoud YouTube: Petroleum Capsules