CHAPTER IV
ALTERNATIVES AND RECOMMENDATION
          Finding and creating the best and practical solutions for the prolonged time of production at Enlins
Bakeshop, based on the observation of the researchers that will solve the problem of the company. After
observing and studying every detail in the production widens the researchers’ minds to come up with ideas that
will help solve the problem. The researchers aim to improve the current production system of Enlins Bakeshop
through the following alternatives.
Alternative No. 1
Replacement of Exhaust fan in the Oven Room
          The researchers have noticed that there are 5 small exhaust fan inside the production area, and 1
exhaust fan at the oven area which is bigger than the others due to its necessity to ventilate the room, yet it isn’t
working. Due to the heat inside the oven room, bakers tend to stop whenever they had finished loading and
unloading the ovens in order to cool down. The researchers suggest replacing the air ventilation in the oven room
with an air volume of 147.37 m³. The size of an air vent is based on the volume of air present and the rate of
ventilation (see figure 4.2) of bakery. Through this the researchers found that the needed exhaust fan is a 16
inches in diameter. Thermal conditions are not well-controlled due to insufficient cooling capacity. The results of
multiple studies are relatively consistent and show an average relationship of 2% decrement in work performance
per °C when the temperature is above 25 °C (Control of Temperature for Health and Productivity in Offices,
Seppanen, Fisk, Faulkner, 2004) this is for industrial buildings, but as for bakeries the required temperature for
worker efficiency is 27 °C. Installation of exhaust fan will happen on a Sunday, where there is no production and
an additional of 1 day. An exhaust fan would lessen the heat inside the oven area by 15% which will give a new
temperature of 32.4°C from the present average temperature of 40.5°C. Through the improved temperature, the
bakers will alter their time for cooling down to arranging and organizing the trays that consumes space inside the
production area.
                                                                          Table 4.1 Rate of Ventilation
         Figure 4.1 Proposed Exhaust Fan
                                                                                                   28
Advantages
            Improve the thermal condition inside the working area
            Workers inside the oven room will convert their time for cooling down to arranging the
             scattered trays to reduce the consumed space.
Disadvantage
            Additional expense
Cost Analysis
        Replacing the exhaust fan inside the oven area would require purchasing a new exhaust fan
and also hiring workers to remove the malfunctioning exhaust fan and to install the new ones. For the
process of installing cement and sand would be needed by the workers. The whole process of installing
the exhaust fan would happen for 2 days, and would affect only a day of production since the operation
would be scheduled either on a Saturday and Sunday or Sunday and Monday.
              Table 4.2 Cost analysis for replacing exhaust fan in the oven room
                                          Quantity                  Price
                Exhaust Fan                   1                    7,263.00
                   Cement                     1                     220.00
                    Sand                      1                     800.00
                    Labor                     4                    2,000.00
            Electric Consumption          1 month                  1,700.35
            Sales for small siopao          1 day                  4,800.00
                 Total Cost                                       21,583.35
                                                                                                              29
         Benefit Analysis
                 Based on a study conducted about the relationship of working temperature to the productivity
         of the workers, the researchers found out that a total of 8% increase will occur in the sales of the
         company.
                      Table 4.2 Benefit analysis for replacing exhaust fan in the oven room
                            Monthly Sales                               115,200.00
                         With 8% increase                               124,416.00
                       Result of 8% increase                              9,216.00
                             Total Cost                                  21,583.35
                                  No. of months before total cost made is paid:
                                    𝟐𝟏, 𝟓𝟖𝟑. 𝟑𝟓
                                                = 𝟐. 𝟑𝟒 ≈ 𝟑 𝒎𝒐𝒏𝒕𝒉𝒔
                                    𝟗, 𝟐𝟏𝟔. 𝟎𝟎
Alternative No. 2
Replacement of Tables
         In order to increase the space available inside the production area, the researchers proposed on
replacing the working tables (see figure 4.3) with new ones but of the same number (see figure 4.4). The
proposed tables are economical in terms of space, since unused trays could be stored under these tables. The
aspect of space utilization of a facility design includes everything from making sure that traffic lanes are wide
enough; to making certain that inventory storage warehouses or rooms utilize as much vertical space as
possible, studies show that an average of 10% in the work performance increase. (Facility Management: Life in
the Fast Lane, Cornacchia, 1994)Since the availability of space does not reach its maximum capacity, the work
performance increased is 6% only. The replacement of tables will happen on Sunday where there is no
production. The proposed tables will have a dimension of, 0.95 meter for total height, 0.60 meter height of the
base, 2 meters in length and 1 meter in width.
                                                                                                 30
Figure 4.3: Present working table                    Figure 4.4: Proposed working table
Advantage
       Increase available space inside the production area, wherein the unused trays or the
        secondary ingredients could be stored underneath these tables.
Disadvantage
       Additional expense
Cost Analysis
        In replacing the present tables, purchasing proposed tables with the dimensions of 2m x 1m x
0.95m and hiring 2 workers to replace it.
                       Table 4.3 Cost analysis for replacing the tables
                                          Quantity                Price
                 Stainless Steel
                                              7                 56,000.00
                 Working tables
                      Labor                   2                  1,000.00
                    Total Cost                                  57,000.00
                                                                                                                31
         Benefit Analysis
                 Based on a study conducted about the relationship of space availability to the productivity of
         the workers, the researchers found out that a total of 6% increase will occur in the sales of the
         company.
                                Table 4.3 Benefit analysis for replacing the tables
                            Monthly Sales                                 115,200.00
                          With 6% increase                                122,112.00
                        Result of 8% increase                              6,912.00
                             Total Cost                                   57,000.00
                                  No. of months before total cost made is paid:
                                     𝟓𝟕, 𝟎𝟎𝟎. 𝟎𝟎
                                                 = 𝟖. 𝟐𝟓 ≈ 𝟗 𝒎𝒐𝒏𝒕𝒉𝒔
                                     𝟔, 𝟗𝟏𝟐. 𝟎𝟎
Alternative No. 3
Widening the space inside the Production Area
          The efficiency of production depends on how well the various machines; production facilities and
employees amenities are located in a plant. Only the properly laid out plant can ensure the smooth and rapid
movement of material, from the raw material to the end product. (Improving Employee and Manpower
Productivity by Plant Layout Improvement Abhishek, Rajbir, Harwinder, 2014) The researchers suggest moving
the flour from the production area (see figure 4.5) to the storage room (see figure 4.6), creating a division from
the ingredients used in specialty breads. Also disposing the broken down machine from the area, this consumed
space as well. (see figure 4.7)The aspect of space utilization of a facility design includes everything from making
sure that traffic lanes are wide enough; to making certain that inventory storage warehouses or rooms utilize as
much vertical space as possible, studies show that an average of 10% in the work performance increase.
(Facility Management: Life in the Fast Lane, Cornacchia, 1994)The researchers also proposes having at least 3
stainless steel working table (see figure 4.4) to maximize space availability, wherein secondary ingredients are
place. A proposed layout is prepared by the researchers. (see figure 4.8)
                                                                                                     32
Figure 4.5 Flour in Production Area                                  Figure 4.6 Storage Room
                                      Figure 4.7 Malfunctioning Machine
             The figures shown above are contributors to the unorganized production area that causes the
     prolonged production of small sioapao at Enlins Bakeshop.
                                                     33
                                   Scale: 1m=100cm
Figure 4.8 Proposed Plant Layout
                                                                                                   34
Advantages
        Smoother flow of production
        More convenient for the workers because the space is improved.
        The backtracks while working will be lessen
Disadvantage
        Additional expense
Cost Analysis
          In widening the space inside the production area, purchasing 3 proposed tables, creating a
division inside the storage area with marine plywood and hiring 4 workers to apply it.
          Table 4.4 Cost analysis for widening the space inside the production area
                                           Quantity                Price
                Marine Plywood                4                   720.00
                   Lumber 2x2x8               5                   575.00
                      Nails                   1                   205.00
                      Labor                   4                  2,000.00
                 Stainless Steel
                                              3                 24,000.00
                 Working Tables
                    Total Cost                                  27,500.00
Benefit Analysis
        Based on a study conducted about the relationship of space availability to the productivity of
the workers, the researchers found out that a total of 6% increase will occur in the sales of the
company.
         Table 4.4 Benefit analysis for widening the space inside the production area
                   Monthly Sales                               115,200.00
                With 10% increase                              126,720.00
             Result of 10% increase                             11,520.00
                    Total Cost                                  27,500.00
                         No. of months before total cost made is paid:
                              𝟐𝟕, 𝟓𝟎𝟎. 𝟎𝟎
                                          = 𝟐. 𝟑𝟗 ≈ 𝟑 𝒎𝒐𝒏𝒕𝒉𝒔
                              𝟏𝟏, 𝟓𝟐𝟎. 𝟎𝟎
                                                                                                                                35
           Present Method             Proposed Method            Date : JANUARY 2017                    Page 1 of 3
                                   Operation Description: SMALL SIOPAO PRODUCTION
                               Present             Proposed            Difference
    Summary             No.         Time      No.         time     No.        time
    Operations          15       43.02 mins 15 43.02 mins                       0
     Transport           8        3.03mins     8       3.03mins                 0                                 Proposed
    Inspections          1            --       1            --                  --                               Plant Layout
       Delays            2       0.67 mins     0            --             0.67 mins                               Attached
     Storages            3       226.9 mins    3      226.9 mins                0
      Distance
                               44.35 m                                        44.35 m
      travelled
                                                                                  DELAYS              DISTANCE    TIME     NO. OF
       Details of Process        METHOD    OPERATIONS   TRANSPORT   INSPECTIONS            STORAGES
                                                                                                         (m)     (mins)   WORKERS
         STORAGE
1                                                                                                                           1
          ROOM
2      TRANSPORT                TROLLEY                                                                35.1      0.9        1
3      UNLOADING                                                                                                 0.08       1
        LOADED TO
4                                                                                                                0.22       1
          MIXER
5         MIXING                                                                                                   5
      TRANSFERRED
6       TO SPIRAL                                                                                      0.31      0.06       1
          MIXER
7         MIXING                                                                                                  15
      TRANSFERRED                                                                                      0.92      0.11       1
8
       TO ROLLER
9         ROLLER                                                                                                 4.77       1
                            Figure 4.2 Proposed Process Chart for the Production of Small Siopao
                                                                                                                           36
  Present Method        Proposed Method           Date : JANUARY 2017                         Page 2 of 3
Operation Description: SMALL SIOPAO PRODUCTION
                        Present           Proposed            Difference
   Summary         No.      Time      No.      time       No.        time
  Operations            15    43.02 mins   15       43.02 mins                                                 Proposed
   Transport             8     3.03mins     8        3.03mins                                                 Plant Layout
  Inspections            1         --       1            --                                                     Attached
     delays              2    0.67 mins     0            --
   Storages              3    226.9 mins    3       226.9 mins
    Distance
                             44.35 m            44.35 m
    travelled
                                                                               DELAYS              DISTANCE    TIME     NO. OF
       Details of Process     METHOD   OPERATIONS    TRANSPORT   INSPECTIONS            STORAGES
                                                                                                                       WORKERS
                                                                                                      (m)     (mins)
     TRANSFERRED                                                                                              0.03        1
10
       TO TABLE
11      KNEADING                                                                                              0.01        1
12       CUTTING                                                                                              0.01        1
13      WEIGHING                                                                                              0.03        1
      ADDITION OF                                                                                             0.02        1
14
       FILLINGS
15       MOLDING                                                                                              0.10        4
       PREPARING                                                                                              0.05        1
16
         TRAYS
17       TRAYING
                                                                                                              0.44        1
      TRANSFERRED
18    TO PROOFING                                                                                  2.56       0.88        1
          AREA
19   DOUGH RISING                                                                                             180
                Figure 4.2 Proposed Process Chart for the Production of Small Siopao (continuation)
                                                                                                                                    37
  Present Method        Proposed Method          Date : JANUARY 2017                                 Page 3 of 3
Operation Description: SMALL SIOPAO PRODUCTION
                        Present          Proposed             Difference
   Summary         No.      Time     No.      time        No.        time
     Operations               15    43.02mins    15       43.02 mins                                                Proposed Plant
      Transport               8      3.03mins     8        3.03mins                                                     Layout
     Inspections              1          --       1            --                                                      Attached
       delays                 2     0.67 mins     0            --
      Storages                         226.9
                              3                   3       226.9 mins
                                       mins
      Distance
                                   44.35 m            44.35 m
      travelled
                                                                                     DELAYS              DISTANCE     TIME     NO. OF
         Details of Process         METHOD   OPERATIONS    TRANSPORT   INSPECTIONS            STORAGES
                                                                                                                              WORKERS
                                                                                                            (m)      (mins)
       TRANSFER TO                                                                                        0.90       0.8        1
20
          OVEN
21        COOKING                                                                                                     15
22     TRANSFER TO                                                                                                   1.15       1
          TRAYS
23     TRANSFER TO                                                                                        3.61       0.9        1
          COOL
24        COOLING                                                                                                    46.9
25       TRANSFER                                                                                         0.95       0.25       1
           QUALITY                                                                                                              2
26         CHECK
         PACKAGING                                                                                                   0.24       2
27
                   Figure 4.2 Proposed Process Chart for the Production of Small Siopao (continuation)
                                                                                                                  38
Recommendation
                               Table 4.2: Cost and Benefit Analysis per alternative
                                                              Result of increase to            Benefit will be
                                    Cost Analysis
                                                                     sales                    experienced after
    Alternative No. 1                 21,583.35                     9,216.00                      3 months
    Alternative No. 2                 57,000.00                     6,912.00                      9 months
    Alternative No. 3                 27,500.00                     11,520.00                     3 months
          .The researchers recommend alternative no. 3 which is, widening the production area. By relocating the
flour that occupies a lot of space that could be allotted for trays, replacing tables with stainless steel ones which
would provide additional location for unused trays because of the second layer underneath it and removing the
unused machine that would promote wider spaces. While rearranging the tables would make the flow of the
process simpler and convenient since there would be wide spaces that would prevent cross-tracking. And the u-
shape flow will prevent the back-tracking among the workers. Among other alternatives, this gives smaller cost
and larger benefit compared to other alternatives stated.
Justification
         This study is conducted to discover problems with relation to the flow of production of small siopao at
Enlins Bakeshop, through observation and data gathering, the researchers found out that the production of
siopao undergo long time production which is caused by, workers’ performance and the availability of space in
the production area. Through analysis, based on alternatives stated, widening the space inside the production
area gives the largest benefit, and would contribute to shorten the prolonged production time of small siopao by
reducing the trays scattered that blocks the pathway causing cross-tracks and delays.