First Floor RCP
First Floor RCP
UJVN LIMITED
Approval Stamp:
Approved by:
                                                                                                                                                            Date
                            Refer to protection notice ISO 16016
TABLE OF CONTENT
                                                                                             1.        INTRODUCTION ................................................................................................................. 3
                                                                                             2.        DESCRIPTION .................................................................................................................... 4
                                                 District Palwal - 121102 (Haryana) INDIA
                                                                                                  Area/Equipment to be pro-
                                                                                                                                    Detection system               Suppression system
                                                                                                  tected
                                                                                                                                    Heat Detector                  Co2 flooding System
                                                                                                  Hydro-Generators
                                                                                                                                    (Existing system)              (Existing system)
                                                                                                                                                                   Automatic High Velocity Water Spray
                                                                                                                                    Quartzite Bulb Detector
                                                                                                  Generator Transformers                                           System
                                                                                                                                    (New supplied)
                                                                                                                                                                   (New supplied)
                                                                                                                                                                   Automatic High Velocity Water Spray
                                                                                                                                    Quartzite Bulb Detector
                                                                                                                                                                   System
                                                                                                  25 MVA Power Transformers         (1 No. – Existing
                                                                                                                                                                   (1 No. – Existing
                                                                                                                                    1 No. - New supplied)
                                                                                                                                                                   1 No. - New supplied)
                                                                                                                                                                   Automatic High Velocity Water Spray
                                                                                                                                    Quartzite Bulb Detector
                                                                                                  3.5 MVA Power Transformers                                       System
                                                                                                                                    (New supplied)
                                                                                                                                                                   (New supplied)
                                                                                                                                    Smoke Detection System &
                                                                                                  Cable Tunnel Between Power                                       Medium Velocity Water Spray Sys-
                                                                                                                                    Manual Pull Stations At The
                                                                                                  House And Outdoor                                                tem
                                                                                                                                    Exit Of The Tunnel.
                                                                                                  Switchyard                                                       (New supplied)
                                                                                                                                    (New supplied)
                                                                                                                                    Smoke Detection System &
                                                                                                  Control Room @ El. 1122.85                                       Portable Fire Extinguishers
                                                                                                                                    Manual Pull Stations
                                                                                                                                                                   (New supplied)
                                                                                                                                    (New supplied)
                                                                                                                                    Smoke Detection System &
                                                                                                                                                                   Portable Fire Extinguishers
                                                                                                  Office @ El. 1129.00              Manual Pull Stations
                                                                                                                                                                   (New supplied)
                                                                                                                                    (New supplied)
                                                                                                                                                                   Foam Type Fire Extinguisher & Fire
                                                                                                                                    Smoke Detection System &
                                                                                                  Area of Oil Pressure Unit Of                                     Hydrant At Suitable Point In The
                                                                                                                                    Manual Pull Stations
                                                                                                  Governor & MIV                                                   Turbine Floor.
                                                                                                                                    (New supplied)
                                                                                                                                                                   (New supplied)
                                                                                                                                    Smoke Detection System &       Fire Hydrants & Portable Fire Extin-
                                                                                                  Power House Floors                Manual Pull Stations.          guishers
                                                                                                                                    (New supplied)                 (New supplied)
                                                                                                                                    Smoke Detection System &       Portable Fire Extinguishers
                                                                                                  Switchgear Room in
                            Refer to protection notice ISO 16016
                                                                                             2. DESCRIPTION
                                                                                                The firefighting system can be divided in following sub systems:
                                                                                               2.1. Water based firefighting system
                                                                                               2.2. C02 flooding system for generators
                                                 District Palwal - 121102 (Haryana) INDIA
This drawing is the PROPERTY of
                                                                                               2.1.3.Hydrant System
                                                                                                The water for the hydrant system of the power plant will be taken out of the water supply line. The water
                                                                                                will be leaded through a pipeline with a nominal diameter of 150mm to the hydrants.
                                                                                                Total 3 no. single headed outdoor hydrants (0SGA10 AA201 to 203) are installed in the power house out-
                            Refer to protection notice ISO 16016
                                                                                                side & other associated area. These will be replaced with the new supplied hydrants. Piping for these hy-
                                                                                                drants is in good condition and will be retained.
                                                                                                The fire hose cabinets (0SGA10 BU001 to 003) are installed near each outdoor hydrant. These will be re-
                                                                                                placed with new cabinets. The hose cabinet will be equipped with fire hose that could be served with wa-
                                                                                                ter out of the hydrant system and shall be 30m as a minimum.
                                                                                                Inside the power plant, no hydrant is installed currently. 8 nos. new hose cabinets (0SGX20 BU001 to
                                                                                                008) will be installed, to ensure that all areas of each floor could be reached by a water based fire extin-
                                                                                                guishing system. Each cabinet shall be equipped with and fire hose reel with 30m of hose and single head-
                                                                                                ed hydrant valve.
                                                                                               Piping containing water for filling and supply header will be heavy duty carbon steel ERW pipes as per
                                                                                               IS:1239.
                                                                                            Client      UJVN LIMITED                     Internal N°                              =
                                                                                            Plant       TILOTH HEP                       C-90-826477-018-02                       +
                                                                                            File        C-90-826477-018-02               Drawing N°                                   Index    Sheet   4
                                                                                            SaveDate    22-12-2017                       TLH-FPS-2000                                 0        of      9   A4
                                                                                             DESIGN MEMORANDUM & CONTROL PHILOSOPHY
                                                                                             FIRE FIGHTING SYSTEM COMMON
                                                                                               2.1.4.HVWS system for generator transformer, 25 MVA power transformer & 3.5 MVA power trans-
                                                                                                     former
                                                                                                1 no. 25 MVA transformer is provided with wet pilot type deluge valve station, spray & detection network
                                                                                                which is installed recently and is in good working condition. This will be retained. Other 3 nos. generator
                                                 District Palwal - 121102 (Haryana) INDIA
                                                                                                transformer, 1 no. 25 MVA transformer and 2 no. 3.5 MVA transformers are provided with dry pilot type
This drawing is the PROPERTY of
                                                                                                pneumatic operated deluge valve stations which will be replaced with wet pilot type deluge stations.
                                                                                                3 nos. generator transformers, 1 no. 25 MVA and 2 no. 3.5 MVA power transformers will be surrounded by
                                                                                                new supplied spray header ring and detection header ring. Spray header ring will be fitted with open high
                                                                                                velocity spray nozzles. The ring main will be connected to the water source header through a wet pilot del-
                                                                                                uge valve station (0SGC10 QH001, 0SGC11 QH001, 0SGC12 QH001, 0SGC21 QH001, 0SGC30 QH001
                                                                                                & 0SGC31 QH001). Deluge valve station will house the deluge valve, y strainer, valves, right angle cock,
                                                                                                water motor gong, pressure gauge, pressure switch etc.).
                                                                                                The spray header will remain charged with water under pressure up to the inlet of the deluge valve. Detec-
                                                                                                tion header ring will be pressurized with water tapped from the upstream of the deluge valve upto the
                                                                                                quartzite bulb (QB) detectors, rated at 79 Deg. C.
                                                                                                Density of discharge will be 10.2 lpm/m2 and the pressure at the hydraulically remotest nozzle will not be
                                                                                                less than 3.5 Kg/cm2 as per NFPA requirement.
                                                                                                The water motor gong will give the local alarm (mechanical) whenever spray system operates. The water
                                                                                                motor gong is a hydraulically driven mechanical bell, which makes continuous alarm when the spray sys-
                                                                                                tem operates.
                                                                                                All piping after new supplied deluge valve station (Spray & detection header piping) will also be
                                                                                                supplied new, water feed pipes upto deluge valve station will be hydro tested and retained if found
                                                                                                ok in hydro test, otherwise will be replaced.
                                                                                                Manual Release
                                                                                                Manual release is accomplished by pressing the push button at manual release station provided at DV
                                                                                                LCP.
                                                                                                The water motor gong will give the local alarm (mechanical) whenever spray system operates. The water
This drawing is the PROPERTY of
                                                                                                motor gong is a hydraulically driven mechanical bell, which makes continuous alarm when the spray sys-
                                                                                                tem operates.
                                                                                               2.1.7.Operation Philosophy of MVWS system for cable tunnel & cable tray room
                                                                                                The system is capable of automatic actuation by following Signals:
                                                                                                          Multi-criteria smoke cum heat Detector installed in the cable tunnel will provide the fire signal. OR
                                                                                                Manual Release
                                                                                                Manual release is accomplished by pressing the push button at manual release station provided at DV
                                                                                                LCP.
                                                                                                Existing system will be connected with main fire alarm system so that it is show the fire alarm at main fire
                                                                                                alarm panel also.
                            Refer to protection notice ISO 16016
                                                                                                The detailed positions and dimensions of the different extinguishers shall be shown at the layout drawings
This drawing is the PROPERTY of
in detail.
                                                                                                          Circuits for the call points and the detectors shall be same and those shall be shown separately
                                                                                                           during detail engineering
                                                                                                          The method of operation of all the call points shall be identical unless there is a special need for
                                                                                                           differentiation.
                                                                                                          The delay between the operation of a call point and the giving of general alarm shall not exceed 3
                                                                                                           seconds.
                                                                                                          Manual pull stations shall be fixed at a height of 1.4 meters above the floor level.
                                                                                                          Manual pull station shall be break glass type and in fire red color.
                                                                                               3.4. Horn cum strobe.
                                                                                                  3.5. Cabling.
This drawing is the PROPERTY of
                                                                                                  All power and control cable of main fire alarm looping cable shall be FRLS copper conductor,
                                                                                                  For power cable 2Cx2.5 sq.mm and for control 2Cx1.5 sq.mm cable respectively shall be provided.
                                                                                                  Following alarm signal for unit shall be consider for HVAC interface
                                                                                                           Common fire signal to HVAC control panel to close the air supply system.
                                                                                                  For above signals necessary monitor and control relay module shall be provided and its detail shall be pro-
                                                                                                  vided during detail engineering.
                                                                                             e)   Deluge Valve
                                                                                                  Body                          : Cast Steel – ASTM A216
                                                                                                  Clapper                       : Bronze LTB-II
                                                                                                  Seat                          : Bronze
                                                                                                  Diaphragm                     : Neoprene
                                                                                                  Valve assembly                : Gun Metal
                                                                                             f)   QB Detector
                                                                                                  Frame                         : Bronze (Cr plated)
                                                                                                  Button                        : Brass/copper
                                                                                                  Bulb                          : Glass
                                                                                                  Material of liquid            : High expansion liquid
                                                                                             g)   Hydrant valve
                                                                                                  Body                          : LTB-318-II
                                                                                                  Spindle                       : Brass Rod
                                                                                                  Female outlet                 : LTB – 318 –II
                                                                                                  Hand wheel                    : Cast Iron
                                                                                                  Blank cap                     : LTB
                                                                                             h)   Hose Pipe & Accessories
                                                                                                  Hose                  : Reinforced Rubber Linend (RRL)
                                                                                                  Branch Pipe                   : Gun Metal / Stainless Steel
                            Refer to protection notice ISO 16016
xxxxxxxxxxxxxxxxx